Do I need council approval to subdivide my land in Queensland?
Short answer
Needs a development application. Subdividing — the planning term is reconfiguring a lot — always needs a development application. The usual pattern is code assessment when every new lot meets the zone's minimum lot size, and impact assessment (with neighbour submissions) when it doesn't. Roads, water and sewer works and infrastructure charges follow.
Check your own property
Add the address, or choose your council, to see the answer for your zone. Different project?
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
The rules, timeframes and costs
These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.
- Minimum lot size
- There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
- One lot into two
- Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
- Neighbour submissions
- An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
- How long an approval lasts
- An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
- Council sign-off on the survey plan
- Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
- Infrastructure charges
- Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
- Registering the plan
- Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
- Near a state road or railway
- An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
- Rural land in South East Queensland
- In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
- What needs no application
- Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
- The dollar figures are the 2026-27 amounts and change each 1 July.
- Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.
- Planning Regulation 2017, Schedule 12 — one lot into two requiring code assessment
- Planning Regulation 2017, Schedule 6, section 21 — reconfigurations a scheme can't make assessable
- Planning Regulation 2017, Schedule 16 — prescribed amounts for infrastructure charges
- Planning Regulation 2017, Schedule 18 — approving plans of subdivision
- Planning Regulation 2017, Schedule 10 — state transport corridors (Part 9) and the South East Queensland regional plan (Part 16)
- Planning Act 2016, sections 53 (public notification) and 85 (when an approval lapses)
- Land Title Act 1994, section 50 — requirements for registering a plan of subdivision
- Titles Queensland — Titles Registry fees 2026-27
The Queensland position
Reconfiguring a lot — splitting one lot into two or more — always needs a development application. The common pattern is code assessment where every new lot meets the zone's minimum lot size, and impact assessment where it doesn't. Some reconfigurations are exempt, such as amalgamating lots or certain building format plans.
What usually happens: a development application, then operational works for roads and services, a survey plan, and infrastructure charges for each new lot.
What else you'll need
- Survey plan
- Infrastructure charges
- Operational works
By council
These councils' own tables of assessment, read zone by zone:
- Subdivide in Banana
- Subdivide in Brisbane
- Subdivide in Bundaberg
- Subdivide in Cairns
- Subdivide in Central Highlands
- Subdivide in Gold Coast
- Subdivide in Moreton Bay
- Subdivide in Fraser Coast
- Subdivide in Gladstone
- Subdivide in Ipswich
- Subdivide in Livingstone
- Subdivide in Logan
- Subdivide in Mackay
- Subdivide in Noosa
- Subdivide in Redland
- Subdivide in Rockhampton
- Subdivide in Scenic Rim
- Subdivide in Sunshine Coast
- Subdivide in Toowoomba
- Subdivide in Townsville
Common questions
- Do I need council approval to subdivide my land in Queensland?
- Yes. Reconfiguring a lot — splitting one lot into two or more — needs a development application. It is commonly code assessable where each new lot meets the zone's minimum size, and impact assessable when it doesn't. Some reconfigurations are exempt, such as amalgamating lots or certain building format plans.
- What is the minimum lot size to subdivide?
- It is set by the zone in your council's planning scheme, and it differs a lot: a few hundred square metres in residential zones, hectares in rural zones. Frontage, slope and whether sewer is available also matter.
- What else do I pay for when I subdivide?
- Beyond the application fee: a surveyor, operational works for roads and services, infrastructure charges to the council for each new lot, and often water and sewer headworks. The council fee is usually the small part.
- How much are infrastructure charges on a subdivision?
- Each council sets its own charge for a new lot, up to a statewide cap. From 1 July 2026 the cap is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Many councils charge at or near the cap. The charge is usually payable before the council signs the survey plan.
- How long does a subdivision approval last?
- 4 years, unless the approval states a different period. Under the Planning Act 2016 the approval lapses if the survey plan hasn't been given to the council for its approval by then.
- Can I subdivide a corner block or a battle-axe lot?
- Possibly — the scheme looks at frontage, access and the shape of each new lot, not only its area. A site report or a town planner can tell you whether your lot's shape works.
Other projects
Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish
General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.