Subdividing land in Livingstone — do you need approval?

Livingstone Shire Council's planning scheme — the Livingstone Planning Scheme 2018 — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

Needs a development application (code assessment). Subdividing is code assessable if every new lot is at least 600 m², otherwise an impact-assessed development application is needed.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Reconfiguring a lot. Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low Density Residential Zone Minimum new lot 600 m² Needs a development application (code assessment) Table 5.5.1 each new lot is 600 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Low-Medium Density Residential Zone Minimum new lot 300 m² Needs a development application (code assessment) Table 5.5.1 each new lot is 300 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Medium Density Residential Zone Minimum new lot 1,000 m² Needs a development application (code assessment) Table 5.5.1 each new lot is 1000 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Emerging Community Zone Minimum new lot 10 ha Needs a development application (code assessment) Table 5.5.1 if no additional lots are created, or each new lot is 10 hectares (100000 m²) or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Rural Residential Zone Minimum new lot 2 ha Needs a development application (code assessment) Table 5.5.1 creating additional lots where each lot is at least 4,000 m² in the Park Residential Precinct, or at least 20,000 m² (2 ha) elsewhereIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Township Zone Minimum new lot 4,000 m² Needs a development application (code assessment) Table 5.5.1 creating additional lots where each proposed lot is at least 4,000 m²If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Community Facilities Zone Needs a development application (code assessment) Table 5.5.1 in all circumstances Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
District Centre Zone Minimum new lot 1,000 m² Needs a development application (code assessment) Table 5.5.1 if it creates no additional lots, or creates additional lots each 1000 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Environmental Management and Conservation Zone Minimum new lot 150 ha Needs a development application (code assessment) Table 5.5.1 if it does not create additional lots, or if it creates lots each 150 hectares or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Limited Development Zone Needs a development application (code assessment) Table 5.5.1 Subdividing land in this zone is always code assessable, meaning you need a development application assessed against the reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Local Centre Zone Minimum new lot 1,000 m² Needs a development application (code assessment) Table 5.5.1 if it creates no additional lots, or creates additional lots each 1000 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Low Impact Industry Zone Minimum new lot 1,000 m² Needs a development application (code assessment) Table 5.5.1 if it does not create additional lots, or if it creates lots each 1000 square metres or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Major Centre Zone Minimum new lot 1,000 m² Needs a development application (code assessment) Table 5.5.1 if it creates no additional lots, or creates additional lots each 1000 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Major Tourism Zone Minimum new lot 10 ha Needs a development application (code assessment) Table 5.5.1 if it does not create additional lots, or creates lots each 10 hectares (100,000 m²) or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Medium Impact Industry Zone Minimum new lot 5,000 m² Needs a development application (code assessment) Table 5.5.1 if it does not create additional lots, or if it creates lots each 5000 square metres or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Neighbourhood Centre Zone Minimum new lot 1,000 m² Needs a development application (code assessment) Table 5.5.1 if it creates no additional lots, or creates additional lots each 1000 m² or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Open Space Zone Needs a development application (code assessment) Table 5.5.1 Subdividing in the open space zone needs a code-assessable development application in all circumstances. Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Rural Zone Minimum new lot 150 ha Needs a development application (code assessment) Table 5.5.1 creating additional lots meeting the minimum area for the location (10 ha in Capricorn Coast Rural Precinct, 60 ha on Class A/B agricultural land, or 150 ha otherwise)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Special Purpose Zone Needs a development application (code assessment) Table 5.5.1 Subdividing land in this zone is always code assessable, meaning you need a development application assessed against the reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Specialised Centre Zone Needs a development application (code assessment) Table 5.5.1 Subdividing land in this zone is always code assessable, meaning you need a development application assessed against the reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code
Sport and Recreation Zone Needs a development application (code assessment) Table 5.5.1 in all circumstances Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, Development works code

Overlays that change the answer

  • Acid Sulfate Soils Overlay. Below 20m AHD, building work, reconfiguring a lot, operational work or a material change of use becomes code assessable where it involves excavation of 100m³ or more of soil/sediment, or filling of land below 5m AHD with 500m³ or more of fill at an average depth of 0.5m or more. (Table 5.9.1)
  • Airport Environs Overlay. Within ANEF contours a material change of use for accommodation, centre, community or entertainment uses becomes code assessable, and reconfiguring a lot becomes code assessable. Within the obstacle limitation surface, building work/MCU that enters operational airspace (or emits plumes/particulates/lights) becomes code assessable. (Table 5.9.2)
  • Biodiversity Overlay. Within a biodiversity overlay (or near a waterway top of bank), a dwelling house/MCU, reconfiguring a lot, operational work (clearing/earthworks), and building work for a secondary dwelling or a standalone Class 10a building become code assessable (unless within an approved building location envelope). (Table 5.9.3)
  • Bushfire Hazard Overlay. Within a bushfire hazard area, a dwelling house, dwelling unit or dual occupancy (and building work for a secondary dwelling) becomes code assessable in the circumstances set out, and reconfiguring a lot becomes code assessable in all circumstances. (Table 5.9.4)
  • Coastal Hazard Overlay. Within the erosion prone area or storm tide hazard area, a dwelling house/MCU and reconfiguring a lot become code assessable in the circumstances set out; building work (new/extension/fill/secondary dwelling) becomes accepted subject to requirements of the coastal hazard overlay code. (Table 5.9.5)
  • Extractive and Mining Resource Area Overlay. Within a Key Resource Area overlay, a material change of use and reconfiguring a lot become code assessable, and building work for a secondary dwelling becomes code assessable. (Table 5.9.6)
  • Flood Hazard Overlay. Within the flood hazard overlay, a dwelling house/MCU and reconfiguring a lot become code assessable in the circumstances set out; building work (new/extension/fill/secondary dwelling) becomes accepted subject to the requirements of the flood hazard overlay code. (Table 5.9.7)
  • Heritage Place Overlay. Within or adjacent to a State or local heritage site (distance triggers of 5–50m by site), MCU, reconfiguring a lot, building work and operational work become accepted subject to requirements or code assessable, particularly where features/trees are altered, removed or demolished. (Table 5.9.8)
  • Landslide Hazard Overlay. Within the landslide hazard overlay (where slope not certified under 15%), MCU and reconfiguring a lot become code assessable, and building work involving >50m³ excavation/fill, a retaining wall ≥1m, or vegetation clearing becomes code assessable. (Table 5.9.9)
  • Scenic Amenity Overlay. Within scenic amenity management areas, coastal green break, coastal scenic transport route or coastline foreshore overlays, building work and MCU that are accepted become accepted subject to requirements (and code assessment escalates); reconfiguring a lot becomes code assessable; certain clearing/earthwork/advertising become ASR or code assessable. (Table 5.9.10)
  • Water Resource Areas Overlay. Within a water resource area, a dual occupancy or dwelling house becomes accepted subject to requirements; other MCU and reconfiguring a lot become code assessable; building work for a secondary dwelling and clearing become accepted subject to requirements. (Table 5.9.11)

Worth knowing in Livingstone

Minimum lot sizes shown are the ToA thresholds above which creating additional lots is code assessable; below those thresholds reconfiguring is impact assessable (the Reconfiguring a Lot Code Table 9.3.3.4.2 sets the detailed minimum lot areas/dimensions/frontages, which was not fully reproduced here). Note precinct variations: Rural Residential (Park Residential Precinct 4000m² vs 2ha elsewhere); Rural Zone (Capricorn Coast Rural Precinct 10ha, Class A/B Agricultural Land 60ha, otherwise 150ha); Rural and Township zones have a Yaamba Historic Township Precinct that changes dwelling house/building work categories. For shop_office the three uses (Shop, Food and drink outlet, Office) can differ — e.g. in centre zones a Shop/Food and drink outlet is often accepted/ASR if within an existing building but code assessable if a new building or drive-through, while in Township and Specialised Centre zones these uses are generally code assessable. The Seaspray Local Plan overrides the underlying zone for dwelling house, dual occupancy and building work within its precincts (dwelling house and dual occupancy are accepted subject to requirements). Overlays only change categories to the extent the premises is affected by the overlay, and overlay effects do not apply where the relevant overlay code's accepted-development acceptable outcomes are met. A separate building approval under the Building Act is required for building work even where planning categorises it as accepted. State Vegetation Management Act rules operate separately from the scheme's clearing provisions.

What Livingstone Shire Council publishes

These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Minimum lot size and frontage
In the Low density residential zone the minimum lot area is 600 square metres and the minimum frontage and lot width is 20 metres. (Applies to: Low density residential zone, all locations.) Livingstone Planning Scheme 2018 Version 4, Part 9.3.3 Reconfiguring a Lot Code (adopted 18 February 2025), Table 9.3.3.4.2
Minimum lot size and frontage
In the Low-medium density residential zone the minimum lot area is 300 square metres and the minimum frontage and lot width is 10 metres. (Applies to: Low-medium density residential zone, all locations.) Livingstone Planning Scheme 2018 Version 4, Part 9.3.3 Reconfiguring a Lot Code (adopted 18 February 2025), Table 9.3.3.4.2
Rear lots
If a subdivision creates a rear lot, only one rear lot is created, all lots meet the minimum size and dimensions for the location, and the rear lot area does not include the access way. (Applies to: Rear (battle-axe) lots, acceptable outcomes AO15.1 and AO15.2.) Livingstone Planning Scheme 2018 Version 4, Part 9.3.3 Reconfiguring a Lot Code (adopted 18 February 2025)
Rear lot access width
The access way for a rear lot has a minimum width of 5 metres in a residential category zone. (Applies to: Rear lots in a residential category zone, the township zone or the rural residential zone (Park Residential Precinct).) Livingstone Planning Scheme 2018 Version 4, Part 9.3.3 Reconfiguring a Lot Code (adopted 18 February 2025), AO15.7
Application fee 2026-27
The 2026-27 reconfiguring a lot (subdivision) application fee is $2,380.00 per application plus $741.00 per lot. (Applies to: All reconfiguring a lot (subdivision) applications.) Fees & Charges 2026/27, effective 1 July 2026 (Livingstone Shire Council)
Survey plan endorsement fee 2026-27
The 2026-27 fee for approval of a plan of subdivision is $741.00 per request plus $262.00 per lot. (Applies to: Standard format plans, community management statements and building format plans.) Fees & Charges 2026/27, effective 1 July 2026 (Livingstone Shire Council)

The statewide rules

These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.

Minimum lot size
There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
One lot into two
Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
Neighbour submissions
An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
How long an approval lasts
An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
Council sign-off on the survey plan
Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
Infrastructure charges
Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
Registering the plan
Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
Near a state road or railway
An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
Rural land in South East Queensland
In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
What needs no application
Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
  • The dollar figures are the 2026-27 amounts and change each 1 July.
  • Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

More about Livingstone

Other projects in Livingstone

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Subdivide in Queensland.

Read from the Livingstone Planning Scheme 2018 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.