Subdividing land in Noosa — do you need approval?
Noosa Shire Council's planning scheme — the Noosa Plan 2020 — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.
In a low density residential
Needs a development application (code assessment). Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes).
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
Zone by zone
Reconfiguring a lot. Residential zones first.
| Zone | What the table says | Conditions | What you'll need |
|---|---|---|---|
| Low Density Residential | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Medium Density Residential | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| High Density Residential | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Tourist Accommodation | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Rural Residential | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Community Facilities | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| District Centre | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Environmental Management and Conservation | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Innovation Zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Local Centre | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Low Impact Industry | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Major Centre | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Medium Impact Industry | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Neighbourhood Centre | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Recreation and Open Space | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
| Rural | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in any Noosa zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a Lot Code (which sets the minimum lot sizes). | Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Works codes |
Overlays that change the answer
- Acid Sulfate Soils Overlay. Any development in Area 1 involving excavation of 100 m³ or more or filling of 500 m³ or more, or in Area 2 involving excavation of 100 m³ or more at or below 5 m AHD, becomes code assessable against the Acid Sulfate Soils Overlay Code. (Table 5.9.1 Acid Sulfate Soils Overlay)
- Biodiversity, Waterways and Wetlands Overlay. Reconfiguring a lot on land mapped as biodiversity significance or riparian buffer area is assessed against the Biodiversity, Waterways and Wetlands Overlay Code. (Table 5.9.2 Biodiversity, Waterways and Wetlands Overlay)
- Bushfire Hazard Overlay. Reconfiguring a lot is also assessed against the Bushfire Hazard Overlay Code. (Table 5.9.3 Bushfire Hazard Overlay)
- Coastal Protection and Scenic Amenity Overlay. Within a coastal protection area, reconfiguring a lot and operational work are code assessable against the Coastal Protection and Scenic Amenity Overlay Code. (Table 5.9.4 Coastal Protection and Scenic Amenity Overlay)
- Extractive Resources Overlay. Within the overlay, a change of use other than a dwelling house on an existing lot, home-based business (not bed and breakfast or classes), animal husbandry or cropping becomes code assessable, and reconfiguring a lot is assessed against the Extractive Resources Overlay Code. (Table 5.9.5 Extractive Resources Overlay)
- Flood Hazard Overlay. On flood hazard land, a change of use or building work other than a dwelling house, home-based business, demolition, limited rooming/short-term accommodation or work inside an existing building becomes code assessable against the Flood Hazard Overlay Code; reconfiguring a lot is also assessed against it. (Table 5.9.6 Flood Hazard Overlay)
- Heritage Overlay. Demolition, relocation or removal of a building, and reconfiguring a lot, are code assessable against the Heritage Overlay Code. (Table 5.9.7 Heritage Overlay)
- Landslide Hazard Overlay. In a moderate, high or very high landslide hazard area, development other than a dwelling house, community residence, home-based business, Class 10 structure, demolition or work inside an existing building becomes code assessable; earthworks over 50 m³ or vegetation clearing are code assessable against the Landslide Hazard Overlay Code. (Table 5.9.8 Landslide Hazard Overlay)
- Regional Infrastructure Overlay. In a water resource catchment and water supply buffer area, a change of use (other than a dwelling house or community residence) that adds an on-site wastewater system or more people living, staying or working on site becomes code assessable; near a gas pipeline or major electricity infrastructure most changes of use other than a dwelling house are code assessable; reconfiguring a lot is code assessable against the Regional Infrastructure Overlay Code. (Table 5.9.9 Regional Infrastructure Overlay)
Worth knowing in Noosa
Noosa Plan 2020 (Amendment 3, effective 20 March 2026), Part 5. A material change of use is impact assessable unless the table says otherwise or the use isn't listed; reconfiguring a lot is code assessable in every zone (Table 5.6.1); building work and operational work are accepted unless the tables say otherwise. Noosa makes demolition or removal of any building code assessable in all zones (Table 5.7.1), unusually. Building work for a dwelling house or a Class 10 structure (shed, carport, pool, fence) is accepted subject to requirements in the Low, Medium and High Density Residential, Tourist Accommodation, Rural Residential and Rural zones; in all other zones building work is accepted only inside an existing building with no new buildings or expansion, otherwise code assessable. A building approval under the Building Act is still needed in all cases. Accepted development subject to requirements that doesn't meet the listed acceptable outcomes becomes code assessable (section 5.3.3). A dwelling house includes a secondary dwelling (granny flat); in the Medium and High Density Residential zones a dwelling house is only listed for lots under 500 m², so on bigger lots the 'any other use' impact row applies. Schedule 6, Part 2 of the Planning Regulation 2017 can make a dwelling house, community residence, home-based business or rooming accommodation accepted regardless of these tables. Precincts: the Major Centre (Noosa Junction Hospitality; Noosa Business Centre Showroom, Business Park, Retail, Village Mixed Use), District Centre (Mary/Thomas Street Health and Wellbeing, Doonella Street, Noosaville Mainstreet), Low Impact Industry (Lionel Donovan Drive Auto, Hofmann Drive, Factory Street, Kin Kin, Gateway West Makers) and Medium Impact Industry (Venture Drive Enterprise) zones have precinct tables that vary some uses; the 'Where not located in a Precinct' tables are empty on the ePlan, so the parent zone table applies outside precincts. The Major Centre page labels its own table 'Table 5.5.1' (a typo) — it is Table 5.5.5. Many rows are tied to named lots or streets (e.g. 99 Noosa Drive, Gympie Terrace, Hastings Street) — check the conditions. Where premises are in more than one zone or overlay, the highest category applies to the part affected. Operational work for a dwelling driveway is accepted subject to the Low Density Housing Code; excavation or filling over 10 m³ (residential and environmental zones) or 100 m³ (other zones) is code assessable. Vegetation clearing benchmarks sit in the Biodiversity, Waterways and Wetlands Overlay Code; state Vegetation Management Act rules apply separately.
What Noosa Shire Council publishes
These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.
- Minimum lot size and width, Low Density Residential
- In the Low Density Residential zone the minimum lot size is 600 m2 with a 17 m average width and a 4.5 m minimum width at the frontage. In Hinterland Villages the minimum is 1,000 m2 if connected to sewerage reticulation or 2,000 m2 otherwise. (Applies to: Low Density Residential zone; no further subdivision outside the designated urban boundary.) Noosa Plan 2020 Fact Sheet 12: Subdivision - reconfiguring a lot (as amended 26 September 2025)
- Minimum lot size and width, Medium Density Residential
- In the Medium Density Residential zone the minimum lot size is 600 m2 with a 17 m width. In Pomona the minimum is 1,000 m2 if connected to sewerage reticulation or 2,000 m2 otherwise. (Applies to: Medium Density Residential zone.) Noosa Plan 2020 Fact Sheet 12: Subdivision - reconfiguring a lot (as amended 26 September 2025)
- Minimum lot size, Rural Residential
- In the Rural Residential zone the minimum lot size is 1.5 hectares with a 30 m width. No further subdivision is allowed in the Regional Landscape and Rural Production designation of the South East Queensland Regional Plan or within the Lake Macdonald water resource catchment. (Applies to: Rural Residential zone.) Noosa Plan 2020 Fact Sheet 12: Subdivision - reconfiguring a lot (as amended 26 September 2025)
- Survey plan endorsement fee 2026-27
- The 2026-27 fee for endorsement of a subdivision plan is an $875 base fee plus $302 per lot. (Applies to: Subdivision plans lodged with council for endorsement.) Fees and Charges 2026-27 (Noosa Shire Council)
- Infrastructure charge per new lot
- Council's infrastructure charge for each new residential lot is $22,817.55 under Charges Resolution (No.10) 2026, effective 21 August 2026. That is council's 60% share of the $38,029.25 prescribed amount. (Applies to: Each residential lot created by reconfiguring a lot (charged as a 3 or more bedroom dwelling).) Noosa Shire Council Charges Resolution (No.10) 2026, effective 21 August 2026
The statewide rules
These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.
- Minimum lot size
- There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
- One lot into two
- Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
- Neighbour submissions
- An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
- How long an approval lasts
- An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
- Council sign-off on the survey plan
- Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
- Infrastructure charges
- Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
- Registering the plan
- Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
- Near a state road or railway
- An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
- Rural land in South East Queensland
- In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
- What needs no application
- Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
- The dollar figures are the 2026-27 amounts and change each 1 July.
- Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.
- Planning Regulation 2017, Schedule 12 — one lot into two requiring code assessment
- Planning Regulation 2017, Schedule 6, section 21 — reconfigurations a scheme can't make assessable
- Planning Regulation 2017, Schedule 16 — prescribed amounts for infrastructure charges
- Planning Regulation 2017, Schedule 18 — approving plans of subdivision
- Planning Regulation 2017, Schedule 10 — state transport corridors (Part 9) and the South East Queensland regional plan (Part 16)
- Planning Act 2016, sections 53 (public notification) and 85 (when an approval lapses)
- Land Title Act 1994, section 50 — requirements for registering a plan of subdivision
- Titles Queensland — Titles Registry fees 2026-27
What else you'll need
- Survey plan
- Infrastructure charges
- Operational works
More about Noosa
- What can you build in Noosa? Council overview and development applications
- Every Queensland zone explained, with what each council allows and the planning overlays that change the answer
- What Noosa Shire Council charges for a development application, compared with other councils
- A Landbrief site report for your Noosa address — every planning layer that applies to the lot
- Development applications in Noosa Heads
- Development applications in Noosaville
- Development applications in Cooroy
- Development applications in Peregian Beach
- Development applications in Pomona
- Development applications in Lake Macdonald
- Development applications in Sunshine Beach
- Development applications in Tewantin
Other projects in Noosa
Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish
The statewide position on this project: Subdivide in Queensland.
Read from the Noosa Plan 2020 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.