Redland City Council's planning scheme — the Redland City Plan 2018 — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

Needs a development application (code assessment). Subdividing this land needs a code assessable development application where lots meet the zone's minimum lot size; lots that don't meet the description require impact assessment.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Reconfiguring a lot. Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low density residential zone Needs a development application (code assessment) Table 5.5.1 lot meets minimum lot size for the zoneIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Low-medium density residential zone Needs a development application (code assessment) Table 5.5.1 lot meets minimum lot size for the zoneIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Medium density residential zone Needs a development application (code assessment) Table 5.5.1 lot meets minimum lot size for the zoneIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Character residential zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 all reconfiguring a lot in this zone Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Emerging community zone Minimum new lot 10 ha Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 if creating any lot less than 10haIf not met: a development application with code assessment. Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Tourist accommodation zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 All Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Community facilities zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Conservation zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 if not being undertaken by Redland City Council Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
District centre zone Needs a development application (code assessment) Table 5.5.1 Any reconfiguring not otherwise listed Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Environmental management zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 if creating a lot in the environment management zone (listed as Conservation / Environment management) Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Local centre zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed (e.g. not Conservation, Environment management, Emerging community, Tourist accommodation, Character residential or Rural) Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Low impact industry zone Needs a development application (code assessment) Table 5.5.1 subdividing is not specifically listed, so the default code assessment row applies where lots meet the minimum Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Major centre zone Needs a development application (code assessment) Table 5.5.1 Any reconfiguring not otherwise listed Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Medium impact industry zone Needs a development application (code assessment) Table 5.5.1 subdividing is not specifically listed, so the default code assessment row applies where lots meet the minimum Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Mixed use zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Neighbourhood centre zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Principal centre zone Needs a development application (code assessment) Table 5.5.1 Any reconfiguring not otherwise listed Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Recreation and open space zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Rural zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 all reconfiguring a lot in the Rural zone Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Specialised centre zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code
Waterfront and marine industry zone Needs a development application (code assessment) Table 5.5.1 any reconfiguring a lot not otherwise listed Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a lot code, The relevant zone code, Healthy waters code, Infrastructure works code, Landscape code, Transport, servicing, access and parking code

Overlays that change the answer

  • Bushfire hazard overlay. No change to the category, but reconfiguring a lot (and assessable material change of use) must also be assessed against the Bushfire hazard overlay code where already assessable. (5.9.1 Bushfire hazard overlay)
  • Airport environs overlay. No change to the category, but assessable development within the airport operational airspace or aviation facility buffer must also be assessed against the Airport environs overlay code. (5.9.1 Airport environs overlay)

Worth knowing in Redland

The tables of assessment do not state numeric minimum lot sizes for reconfiguring a lot; the numeric minimums live in the Reconfiguring a lot code and individual zone codes (not reproduced here). Reconfiguring a lot is impact assessable in the Conservation, Environmental management, Character residential, Tourist accommodation and Rural zones, and in the Emerging community zone where any lot under 10ha is created; it is otherwise code assessable. Building work for a dwelling house (shed, pool, fence, extension, demolition) is generally accepted development under the planning scheme unless an overlay applies (see overlay_triggers) — but a building approval under the Building Act 1975 is still required, and dwelling-house building work in the Low density residential zone precincts LDR1–LDR5 (and dual occupancy/associated building work in LDR5) is accepted subject to requirements against the zone code. Secondary dwellings (granny flats) are treated as part of a 'dwelling house' under the QPP; a dwelling house containing a secondary dwelling still counts as one dwelling for assessment triggers in rural/emerging/environmental management/conservation zones. Where premises are in more than one zone or overlay, the highest category applies. The Transport noise corridor overlay is for information only (building work assessed under QDC Part 4.4). State Vegetation Management Act and Planning Regulation clearing exemptions operate separately from this scheme. There are no local plans in this scheme. Precinct variations (LDR1–5, MDR1–9, CF1–9) can change categories within a zone and should be checked against the relevant zone map.

What Redland City Council publishes

These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Minimum lot size and frontage, Low density residential zone
The Redland City Plan lists a minimum lot area of 400 square metres and a minimum frontage of 10 metres for the Low density residential zone outside the LDR1, LDR2 and LDR4 precincts. (Applies to: Low density residential zone, other than precincts LDR1, LDR2 and LDR4.) Redland City Plan 2018, Version 14 (Redland City Council, updated 23 September 2026)
Minimum lot size and frontage, Low-medium density residential zone
The Redland City Plan lists a minimum lot area of 400 square metres and a minimum frontage of 10 metres for the Low-medium density residential zone. (Applies to: Low-medium density residential zone.) Redland City Plan 2018, Version 14 (Redland City Council, updated 23 September 2026)
Rear lot accessway width
The Redland City Plan sets minimum accessway widths for rear lots in residential zones of 4.5 metres where serving one lot, or 6 metres where serving more than one lot. (Applies to: Rear lots in a residential zone category.) Redland City Plan 2018, Version 14 (Redland City Council, updated 23 September 2026)
Plan of subdivision fee (2026-27)
The 2026-27 Redland City Council fee for a standard format, building format or volumetric survey plan is $565 per lot. (Applies to: Plan of subdivision (survey plan) approval requests.) 2026-2027 Register of Fees, General Meeting 17 June 2026 (Redland City Council)

The statewide rules

These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.

Minimum lot size
There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
One lot into two
Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
Neighbour submissions
An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
How long an approval lasts
An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
Council sign-off on the survey plan
Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
Infrastructure charges
Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
Registering the plan
Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
Near a state road or railway
An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
Rural land in South East Queensland
In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
What needs no application
Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
  • The dollar figures are the 2026-27 amounts and change each 1 July.
  • Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

More about Redland

Other projects in Redland

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Subdivide in Queensland.

Read from the Redland City Plan 2018 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.