Subdividing land in Sunshine Coast — do you need approval?

Sunshine Coast Council's planning scheme — the Sunshine Coast Planning Scheme 2014 (Amendment 27) — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

Needs a development application (code assessment). Subdividing in the low density residential zone needs a code assessable development application if the new lots meet the scheme's minimum lot size, otherwise an impact assessable one.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Reconfiguring a lot. Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low density residential zone Needs a development application (code assessment) Table 5.6.1 if every new lot meets the minimum lot size in the applicable local plan code or column 2A of Table 9.4.4.3.2 of the Reconfiguring a lot code; impact regardless in Buderim precinct BUD LPP-1 and Caloundra West precinct CAW LPP-1 (Tables 5.9.2, 5.9.4.1)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Medium density residential zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the medium density residential zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
High density residential zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the high density residential zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Tourist accommodation zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the tourist accommodation zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Rural residential zone Needs a development application (code assessment) Table 5.6.1 if every new lot meets the minimum lot size in the applicable local plan code or column 2A of Table 9.4.4.3.2 of the Reconfiguring a lot codeIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Emerging community zone Needs a development application (code assessment) Table 5.6.1 if in accordance with an approved plan of development that hasn't lapsed, or a development approval current at the scheme's commencementIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Community facilities zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the community facilities zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
District centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the district centre zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Environmental management and conservation zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the environmental management and conservation zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
High impact industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the high impact industry zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Limited development (landscape residential) zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.6.1 if creating one or more additional lots Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Local centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the local centre zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Low impact industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the low impact industry zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Major centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the major centre zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Medium impact industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the medium impact industry zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Open space zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the open space zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Principal centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the principal centre zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Rural zone Needs a development application (code assessment) Table 5.6.1 if every new lot meets the minimum lot size in the applicable local plan code or column 2A of Table 9.4.4.3.2 of the Reconfiguring a lot code (or splits a pre-scheme lot in two along a road gazetted before March 2006)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Specialised centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the specialised centre zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Sport and recreation zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the sport and recreation zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Tourism zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the tourism zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes
Waterfront and marine industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the waterfront and marine industry zone needs a code assessable development application assessed against the Reconfiguring a lot code. Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable local plan code, Applicable zone code, Reconfiguring a lot code, Prescribed other development codes

Overlays that change the answer

The table above is the base case, before any overlay. Flood, bushfire, landslide, heritage and character overlays are the usual reasons a normally-accepted project becomes a development application — add your address above and the tool flags the ones that apply to your lot.

Worth knowing in Sunshine Coast

Sunshine Coast Planning Scheme 2014 (Amendment 27), Part 5, converted from the council PDF. A material change of use is impact assessable unless the table says otherwise or the use isn't listed; reconfiguring a lot is code assessable unless Table 5.6.1 says otherwise; building work and operational work are accepted unless the tables say otherwise (section 5.3.2). The scheme writes 'Accepted development' with a code in the requirements column; under section 5.3.3 that is accepted development subject to requirements, and failing an acceptable outcome makes it code assessable — mapped here as accepted_subject_to_requirements. A dwelling house (including a secondary dwelling) is listed only in the Low, Medium and High density residential, Tourist accommodation, Emerging community, Limited development (landscape residential), Rural and Rural residential zones; elsewhere the 'all other uses' impact row applies. Schedules 6, 7 and 10 of the Planning Regulation 2017 override the scheme (5.3.2(10)). Building work (Table 5.7.1, not involving a change of use) is accepted if minor building work or tied to an accepted use, accepted subject to the applicable use code where it has accepted-development outcomes, and otherwise code assessable — the Building Act building approval is separate. Demolition isn't singled out in Table 5.7.1; only the Heritage and character areas overlay makes it impact assessable. Vegetation clearing that isn't exempt vegetation clearing is code assessable against the Vegetation management code in every zone (Table 5.8.1); filling or excavation over 50 m³ is code assessable except on Rural/Rural residential lots over 5,000 m² (up to 150 m³). Minimum lot sizes sit in Table 9.4.4.3.2 of the Reconfiguring a lot code, not Part 5. Precincts and local plans: Precinct LDR1 (Protected Housing Area) makes a dual occupancy impact assessable in the Low density residential zone; Buderim BUD LPP-1 and Caloundra West CAW LPP-1 make any extra lot impact assessable; the Town of Seaside precinct (Maroochy North Shore MNS LPP-2) accepts any use or building work in accordance with its subdivision permit, otherwise impact; the Palmview declared master planned area follows its Structure Plan; the Emerging community and Tourism zones expect a master plan/approved plan of development that may vary categories; the airport and aerodrome precincts, Kawana, Nambour, Sippy Downs, Mooloolaba and Maroochydore local plans vary business uses (section 5.9). Where premises are in more than one zone, local plan or overlay the highest category applies; an overlay category overrides a zone or local plan category (5.3.2(8)). Many overlays (bushfire, flood, coastal protection, landslide, scenic amenity, regional infrastructure, water resource catchments) bring 'no change' of category but add their overlay code as a benchmark when the development is already assessable.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

More about Sunshine Coast

Other projects in Sunshine Coast

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Subdivide in Queensland.

Read from the Sunshine Coast Planning Scheme 2014 (Amendment 27) tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.