Subdividing land in Mackay — do you need approval?
Mackay Regional Council's planning scheme — the Mackay Region Planning Scheme 2017 — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.
In a low density residential zone
Needs a development application (code assessment). Subdividing land needs a code assessable development application in every zone, assessed against the zone code and the Reconfiguring a lot code, which sets the lot sizes.
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
Zone by zone
Reconfiguring a lot. Residential zones first.
| Zone | What the table says | Conditions | What you'll need |
|---|---|---|---|
| Low density residential zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Medium density residential zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| High density residential zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Rural residential zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Township zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Emerging community zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Community facilities zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Conservation zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| District centre zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| High impact industry zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Industry investigation zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Local centre zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Low impact industry zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Major centre zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Mixed use zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Neighbourhood centre zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Open space zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Principal centre zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Rural zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Special purpose zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Specialised centre zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Sport and recreation zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
| Tourism zone | Needs a development application (code assessment) Table 5.6.1 | unless accepted under Schedule 6, Part 4, Item 21 of the Planning Regulation or done by or for Mackay Regional Council for a utility or municipal facility | Survey plan; Infrastructure charges; Operational worksAssessed against: Relevant zone code, Reconfiguring a lot code, General development requirements code, Healthy waters code |
Overlays that change the answer
- Acid sulfate soils overlay. A material change of use (other than a dwelling house, dual occupancy or home-based business) or a subdivision creating 2 or more extra lots becomes code assessable where at or below 5 m AHD it excavates 100 m³ or more or fills 500 m³ or more (average 0.5 m deep), or between 5 m and 20 m AHD it excavates 100 m³ or more below 5 m AHD. (Table 5.10.1)
- Agricultural land overlay. On Agricultural land class A or B, a Locally important agricultural area or either buffer, a material change of use (other than a dwelling house, home-based business and other listed rural uses) and any reconfiguring a lot become code assessable against the Agricultural land overlay code. (Table 5.10.2)
- Airport environs overlay. A material change of use or reconfiguring a lot becomes code assessable within building restriction area zone A, a public safety area, or the lighting management area where involving certain lighting, flare plumes or reflective cladding; subdivision with a straight lit street of 500–1,000 m in the lighting management area is impact assessable. (Table 5.10.3)
- Biodiversity overlay. In environmentally significant vegetation, wildlife habitat, waterways, wetlands or their buffers, a material change of use (other than a dwelling house, home-based business and some rural and park uses) and any reconfiguring a lot become code assessable; earthworks over 200 mm deep and 50 m³ there are also code assessable. (Table 5.10.4)
- Bushfire hazard overlay. In a very high, high or medium bushfire hazard area or within 100 m of one, centre activities, multiple dwelling activities (which include dual occupancy) and reconfiguring a lot become code assessable against the Bushfire hazard overlay code. (Table 5.10.5)
- Extractive resources and high impact activities overlay. On a key resource area (resource/processing or separation area), within 100 m of a key resource area transport route, or in a high impact activity or non-KRA quarry area or buffer, a dual occupancy, multiple dwelling and other sensitive uses, and any reconfiguring a lot, become code assessable. (Table 5.10.6)
- Flood and coastal hazards overlay. Other uses (except non-residential uses moving into an existing building previously used by a non-residential use) and any reconfiguring a lot become code assessable within the 1% or 0.2% AEP flood area, the storm tide inundation area or the erosion prone area; filling over 50 m³ outside a building envelope there is also code assessable. (Table 5.10.7)
- Flood risk (Finch Hatton) overlay. Uses not otherwise listed (including a multiple dwelling) and any reconfiguring a lot are code assessable in any Finch Hatton flood risk area; a shop or office is accepted in an existing non-residential building (no extra floor area in the high or very high risk areas), otherwise code assessable. (Table 5.10.8)
- Heritage and neighbourhood character overlay. On or adjoining a local heritage place, a material change of use (other than a home-based business and a few listed uses) and any reconfiguring a lot become code assessable against the Heritage and neighbourhood character overlay code (unless a Queensland Heritage Act exemption certificate applies). (Table 5.10.9)
- Landscape character and image corridor overlay. Within a landscape character area or on land adjoining an image corridor, a material change of use (other than a dwelling house, home-based business, new uses in an existing building and some rural uses) and any reconfiguring a lot become code assessable. (Table 5.10.10)
- Landslide hazard overlay. Within the landslide hazard area other uses (except a home-based business and a few listed uses), any reconfiguring a lot and earthworks over 50 m³ become code assessable. (Table 5.10.11)
- Regional infrastructure overlay. On land identified as regional electricity infrastructure, a substation or railway infrastructure, any material change of use (including a dwelling house and home-based business) and any reconfiguring a lot become code assessable against the Regional infrastructure overlay code. (Table 5.10.12)
- Regional infrastructure overlay. On land proximate to regional electricity infrastructure, a substation or railway infrastructure, or in a regional irrigation area, a material change of use (other than a dwelling house, home-based business and some rural uses) and any reconfiguring a lot become code assessable. (Table 5.10.12)
Worth knowing in Mackay
Mackay Region Planning Scheme 2017 (Version 5.0), Part 5, converted from the council PDF. A material change of use is impact assessable unless the table says otherwise or the use isn't listed (section 5.3.2(1)); reconfiguring a lot is code assessable in every zone (Table 5.6.1); building work and operational work are accepted unless the tables say otherwise (section 5.3.2(3)). There is no building work table for zones (section 5.7): building work is only regulated through the Airport environs, Heritage and neighbourhood character and Flood risk (Finch Hatton) overlays, so a shed, extension, pool, fence or demolition needs no planning development application elsewhere — a building approval under the Building Act is still needed. Accepted development subject to requirements that doesn't meet the nominated acceptable outcomes becomes code assessable (section 5.3.3(2)). A dwelling house includes a secondary dwelling (granny flat); it is accepted (no requirements) in the Emerging community, High, Medium and Low density residential and Township zones, accepted subject to the Dwelling house code in the Rural and Rural residential zones, limited to precincts in the Mixed use (MX2), Specialised centre (SC2) and Neighbourhood centre (code in Finch Hatton) zones, and impact assessable elsewhere. Dual occupancy is not listed in the High density residential, Rural or Rural residential zones, so it is impact assessable there. 'Centre activities' and 'Multiple dwelling activities' are defined activity groups (Schedule 1) — shop, office and food and drink outlet are centre activities; dual occupancy is treated here as a multiple dwelling activity where only the group is listed (Emerging community, Township, Bushfire hazard overlay). Precincts vary uses in several zones (e.g. Medium density residential MD1/MD2, Mixed use Fringe commercial MX2, Specialised centre SC1/SC2, High impact industry sugar mill HI1). Local plans: the Mackay city centre local plan (Table 5.9.1) makes many uses impact assessable in the education mixed use (CC3), exhibition/events (CC4) and civic (CC5) precincts — including multiple dwellings, and shops/offices in CC4/CC5 — and adds its local plan code; the Marian central local plan (Table 5.9.2) adds its code without changing categories. Where premises are in more than one zone, local plan or overlay the highest category applies to the part affected, but a local plan category overrides a zone and an overlay overrides both (section 5.3.2(8)–(9)). Schedule 6 of the Planning Regulation 2017 overrides the scheme (e.g. community residence, Schedule 12 one-into-two lot subdivisions). Part 5 states no minimum lot sizes — they sit in the zone and Reconfiguring a lot codes. Operational work: excavation or filling over 20 m³ or 200 mm deep is code assessable in key urban areas and the Township zone (other thresholds in Rural residential and rural zones); the scheme does not list vegetation clearing, and state Vegetation Management Act rules apply separately.
What Mackay Regional Council publishes
These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.
- Minimum lot size and frontage: Low density residential zone
- In the Low density residential zone the minimum lot size is 400 m2 and the minimum frontage width is 10 metres. (Applies to: Low density residential zone (Reconfiguring a lot code, Table 9.4.3.3.B).) Mackay Region Planning Scheme 2017, Version 5.0 (Mackay Regional Council)
- Rear (battle-axe) lots
- A rear residential lot is acceptable only where it is needed to keep an existing building and no more than 1 rear lot is created. Its area, not counting the access strip, has to meet the zone minimum lot size. (Applies to: Rear residential lots (battle-axe lots) under the Reconfiguring a lot code, acceptable outcomes AO10.1 and AO10.2.) Mackay Region Planning Scheme 2017, Version 5.0 (Mackay Regional Council)
- Rear lot access strip width
- The access strip of a rear residential lot needs direct frontage to a constructed public road and a minimum width of 5 metres. (Applies to: Rear residential lots (battle-axe lots), acceptable outcome AO10.3.) Mackay Region Planning Scheme 2017, Version 5.0 (Mackay Regional Council)
- Infrastructure charge: smaller lots
- The infrastructure charge per lot is multiplied by a lot size factor: 1 for lots over 550 m2, 0.5 for 450 to 550 m2, 0.25 for 300 to 450 m2 and 0.1 for lots of 300 m2 or less. (Applies to: Reconfiguring a lot under the March 2026 charges resolution, section 5.1.2.) Mackay Regional Council Infrastructure Charges Resolution, March 2026 (has effect from 2 March 2026)
- Development application fee 2026-27
- The 2026-27 base fee for a development application for reconfiguring a lot for a subdivision is $3,400. (Applies to: Subdivision applications; the schedule adds $350 per additional lot only where more than two lots are created.) Mackay Regional Council Schedule of Fees and Charges 2026-2027 (adopted August 2026)
- Plan signing (plan sealing) fee 2026-27
- The 2026-27 base fee for the council to sign a plan of subdivision is $1,800 where works are completed or on maintenance, and $3,700 where works have not been accepted on maintenance. (Applies to: Signing plans of subdivision; $250 per additional lot applies only where more than two lots are created.) Mackay Regional Council Schedule of Fees and Charges 2026-2027 (adopted August 2026)
The statewide rules
These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.
- Minimum lot size
- There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
- One lot into two
- Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
- Neighbour submissions
- An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
- How long an approval lasts
- An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
- Council sign-off on the survey plan
- Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
- Infrastructure charges
- Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
- Registering the plan
- Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
- Near a state road or railway
- An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
- Rural land in South East Queensland
- In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
- What needs no application
- Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
- The dollar figures are the 2026-27 amounts and change each 1 July.
- Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.
- Planning Regulation 2017, Schedule 12 — one lot into two requiring code assessment
- Planning Regulation 2017, Schedule 6, section 21 — reconfigurations a scheme can't make assessable
- Planning Regulation 2017, Schedule 16 — prescribed amounts for infrastructure charges
- Planning Regulation 2017, Schedule 18 — approving plans of subdivision
- Planning Regulation 2017, Schedule 10 — state transport corridors (Part 9) and the South East Queensland regional plan (Part 16)
- Planning Act 2016, sections 53 (public notification) and 85 (when an approval lapses)
- Land Title Act 1994, section 50 — requirements for registering a plan of subdivision
- Titles Queensland — Titles Registry fees 2026-27
What else you'll need
- Survey plan
- Infrastructure charges
- Operational works
More about Mackay
- What can you build in Mackay? Council overview and development applications
- Every Queensland zone explained, with what each council allows and the planning overlays that change the answer
- What Mackay Regional Council charges for a development application, compared with other councils
- A Landbrief site report for your Mackay address — every planning layer that applies to the lot
- Development applications in Paget
- Development applications in Sarina
- Development applications in Rural View
- Development applications in South Mackay
- Development applications in East Mackay
- Development applications in Andergrove
- Development applications in West Mackay
- Development applications in Bakers Creek
Other projects in Mackay
Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish
The statewide position on this project: Subdivide in Queensland.
Read from the Mackay Region Planning Scheme 2017 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.