Subdividing land in Gladstone — do you need approval?
Gladstone Regional Council's planning scheme — the Gladstone Regional Council Planning Scheme (Version 2.1) — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.
In a low density residential zone
Needs a development application (code assessment). Subdividing in the Low density residential zone needs a code assessable development application if every new lot is at least 600 m² (800 m² in the Calliope neighbourhood precinct), otherwise an impact assessable one.
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
Zone by zone
Reconfiguring a lot. Residential zones first.
| Zone | What the table says | Conditions | What you'll need |
|---|---|---|---|
| Low density residential zone Minimum new lot 600 m² | Needs a development application (code assessment) Table 5.6.1 | every lot created is at least 600 m² (at least 800 m² in the Calliope neighbourhood precinct)If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Low density residential zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Low–medium density residential zone Minimum new lot 400 m² | Needs a development application (code assessment) Table 5.6.1 | every lot is at least 400 m² outside the Beaches Village Circuit precinct, or at least 1,000 m² inside itIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Low–medium density residential zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Medium density residential zone Minimum new lot 400 m² | Needs a development application (code assessment) Table 5.6.1 | every lot is at least 400 m² outside the Beaches Village Circuit precinct, or at least 1,000 m² inside itIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Medium density residential zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Character residential zone | Needs a development application (impact assessment — neighbours can make submissions) Table 5.6.1 | Subdividing land in the Character residential zone always needs an impact assessable development application, which the public can comment on. | Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme, Character residential zone code, Reconfiguring a lot code |
| Rural residential zone Minimum new lot 1.5 ha | Needs a development application (code assessment) Table 5.6.1 | every additional lot is at least 1.5 ha, or at least 6,000 m² where provided with a full reticulated water supply; or the proposal is a boundary realignmentIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Rural residential zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Emerging community zone Minimum new lot 50 ha | Needs a development application (code assessment) Table 5.6.1 | every lot created is at least 50 haIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Emerging community zone code, Reconfiguring a lot code, Development design code |
| Township zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Township zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Township zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Centre zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Centre zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Centre zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Community facilities zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Community facilities zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Community facilities zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Conservation zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Conservation zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Conservation zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Environmental management zone | Needs a development application (impact assessment — neighbours can make submissions) Table 5.6.1 | Subdividing land in the Environmental management zone always needs an impact assessable development application, which the public can comment on. | Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme, Environmental management zone code, Reconfiguring a lot code |
| Industry investigation zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Industry investigation zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Industry investigation zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Limited development zone (constrained land) | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Limited development zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Limited development zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Low impact industry zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Low impact industry zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Low impact industry zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Major tourism zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Major tourism zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Major tourism zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Medium impact industry zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Medium impact industry zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Medium impact industry zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Minor tourism zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Minor tourism zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Minor tourism zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Mixed use zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Mixed use zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Mixed use zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Neighbourhood centre zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Neighbourhood centre zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Neighbourhood centre zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Open space zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Open space zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Open space zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Principal centre zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Principal centre zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Principal centre zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Rural zone Minimum new lot 250 ha | Needs a development application (code assessment) Table 5.6.1 | new lots are not on Agricultural Land Class A or Class B and every lot is at least 250 ha, or the proposal is a boundary realignmentIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Rural zone code, Reconfiguring a lot code, Development design code |
| Special industry zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Special industry zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Special industry zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Special purpose zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Special purpose zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Special purpose zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Specialised centre zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Specialised centre zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Specialised centre zone code, Reconfiguring a lot code, Development design code, Landscaping code |
| Sport and recreation zone | Needs a development application (code assessment) Table 5.6.1 | Subdividing land in the Sport and recreation zone needs a code assessable development application in all circumstances, assessed against the zone code and the Reconfiguring a lot code. | Survey plan; Infrastructure charges; Operational worksAssessed against: Sport and recreation zone code, Reconfiguring a lot code, Development design code, Landscaping code |
Overlays that change the answer
- Acid sulfate soils overlay. On land at or below 20 m AHD, a change of use or subdivision that excavates 100 m³ or more of soil at or below 5 m AHD, or fills 500 m³ or more (average depth 0.5 m or more) on land at or below 5 m AHD, becomes code assessable if it would otherwise be accepted. (Table 5.10.1 Acid sulfate soils overlay code)
- Airport environs overlay. Any change of use, subdivision or building work becomes impact assessable if a structure intrudes above the Obstacle Limitation Surface, Transitional Surface or Approach and Departure Surface, and code assessable if within the ANEF 25–30 or 30–35 contour. (Table 5.10.1 Airport environs overlay code)
Worth knowing in Gladstone
Gladstone Regional Council Planning Scheme (Version 2.1), Part 5, converted from the council's PDF (not an official copy). A material change of use is impact assessable unless the table says otherwise or the use isn't listed; reconfiguring a lot is code assessable unless Table 5.6.1 says otherwise; building work and operational work are accepted unless the tables say otherwise (section 5.3.2). Building work (section 5.7): for a dwelling house there is 'no change to assessment category' against the relevant zone code, and no other building work is regulated unless an overlay table says so — so sheds, extensions, pools, fences and demolition need no planning development application outside overlays (mainly the Heritage overlay); a building approval under the Building Act is still needed. Accepted development subject to requirements that doesn't meet the listed acceptable outcomes becomes code assessable (section 5.3.3). Schedule 6 of the Planning Regulation (Table 5.4.1) can make a dwelling house or community residence accepted development regardless of the zone tables; Table 5.4.2 lets a one-into-two-lot subdivision in a residential or industry zone (not rural residential) be code assessable under schedule 10, part 12 of the Regulation against schedule 12 benchmarks. Precincts: Medium density residential — Beaches Village Circuit (dwelling house and dual occupancy impact assessable; 1,000 m² lots) and Gladstone West Hospital (shop/office/café code); Low density residential — Calliope neighbourhood (800 m² lots); Mixed use — Jeffery Court (office and some other uses lose their code/accepted pathway); Specialised centre — Clinton and Central Gladstone / Toolooa Street east (the only places retail/office uses are listed); Low impact industry — Hanson Road (showrooms, hardware); Medium impact industry — Red Rover Road (structure-plan pathway); Rural residential — Bicentennial Drive Enterprise; Sport and recreation — Benaraby Motor Sport; Special purpose — Gladstone Airport; Limited development — Flood affected lands (dwelling house code assessable, home based business accepted subject to requirements) and Major industry buffer. There are no local plans (section 5.9). Operational work: earthworks of 100 m³ or more are code assessable in all zones (Rural zone: 500 m³ for water retention, 100 m³ otherwise, accepted subject to requirements); the Coastal hazard and Flood hazard overlays make filling or excavation over 50 m³ code assessable. The Coastal hazard, Hazardous activities, Steep land, Scenic amenity and Water resource catchment overlays don't change the category but add their own acceptable outcomes to accepted development subject to requirements (code assessable if not met). Where land is in more than one zone or overlay, the highest category applies, and an overlay's category overrides the zone's (section 5.3.2).
What Gladstone Regional Council publishes
These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.
- Minimum lot size and frontage
- In the Low density residential zone the minimum lot size is 600 square metres (800 square metres in the Calliope neighbourhood precinct) and the minimum frontage is 17 metres. (Applies to: Low density residential zone.) Gladstone Regional Council Planning Scheme (Our Place Our Plan) Version 2.1, Part 9 Development codes, Reconfiguring a lot code, Table 9.3.7.3.2
- Rear lot access handle
- The access handle of a rear lot has a minimum width of 4 metres. (Applies to: Rear (battle-axe) lots, acceptable outcome AO2.4.) Gladstone Regional Council Planning Scheme (Our Place Our Plan) Version 2.1, Part 9 Development codes, Reconfiguring a lot code
- Application fee 2026-27
- The 2026-27 code assessable reconfiguring a lot application fee is $2,728.00 per application plus $405.00 per additional lot. The impact assessable fee is $4,019.00 plus $405.00 per additional lot. (Applies to: Reconfiguring a lot applications.) Fees and Charges Register 2026/27: Development Services (Gladstone Regional Council)
- Survey plan endorsement fee 2026-27
- The 2026-27 fee for assessment and endorsement of a survey plan is $1,330.00 per survey plan plus $68.00 per additional lot. (Applies to: Survey plans lodged with Council.) Fees and Charges Register 2026/27: Development Services (Gladstone Regional Council)
- Infrastructure charge per lot
- The adopted infrastructure charge for reconfiguring a lot is $32,490.95 per lot in Area 1, $24,368.20 in Area 2 and $16,245.50 in Area 3, under the Infrastructure Charge Resolution 2025, which has effect from 2 March 2026. (Applies to: New lots in Charge Areas 1, 2 and 3.) Infrastructure Charge Resolution 2025 (Gladstone Regional Council, effect from 2 March 2026), Appendix 1 Table 1
The statewide rules
These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.
- Minimum lot size
- There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
- One lot into two
- Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
- Neighbour submissions
- An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
- How long an approval lasts
- An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
- Council sign-off on the survey plan
- Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
- Infrastructure charges
- Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
- Registering the plan
- Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
- Near a state road or railway
- An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
- Rural land in South East Queensland
- In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
- What needs no application
- Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
- The dollar figures are the 2026-27 amounts and change each 1 July.
- Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.
- Planning Regulation 2017, Schedule 12 — one lot into two requiring code assessment
- Planning Regulation 2017, Schedule 6, section 21 — reconfigurations a scheme can't make assessable
- Planning Regulation 2017, Schedule 16 — prescribed amounts for infrastructure charges
- Planning Regulation 2017, Schedule 18 — approving plans of subdivision
- Planning Regulation 2017, Schedule 10 — state transport corridors (Part 9) and the South East Queensland regional plan (Part 16)
- Planning Act 2016, sections 53 (public notification) and 85 (when an approval lapses)
- Land Title Act 1994, section 50 — requirements for registering a plan of subdivision
- Titles Queensland — Titles Registry fees 2026-27
What else you'll need
- Survey plan
- Infrastructure charges
- Operational works
More about Gladstone
- What can you build in Gladstone? Council overview and development applications
- Every Queensland zone explained, with what each council allows and the planning overlays that change the answer
- What Gladstone Regional Council charges for a development application, compared with other councils
- A Landbrief site report for your Gladstone address — every planning layer that applies to the lot
- Development applications in Agnes Water
- Development applications in Clinton
- Development applications in Tannum Sands
- Development applications in Boyne Island
- Development applications in New Auckland
- Development applications in Calliope
- Development applications in Gladstone Central
- Development applications in West Gladstone
Other projects in Gladstone
Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish
The statewide position on this project: Subdivide in Queensland.
Read from the Gladstone Regional Council Planning Scheme (Version 2.1) tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.