Subdividing land in Bundaberg — do you need approval?

Bundaberg Regional Council's planning scheme — the Bundaberg Regional Council Planning Scheme 2015 — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

Needs a development application (code assessment). Subdividing in this zone needs a code assessable development application if every new lot meets the minimum lot size in the Reconfiguring a lot code; smaller lots need an impact assessable development application.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Reconfiguring a lot. Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low density residential zone Needs a development application (code assessment) Table 5.5.1 if the new lots comply with the minimum lot size in Column 2 of Table 9.3.4.3.2 of the Reconfiguring a lot code (or are community title lots for an existing or approved dual occupancy or multiple dwelling)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Medium density residential zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
High density residential zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Rural residential zone Needs a development application (code assessment) Table 5.5.1 if the new lots comply with the minimum lot size in Column 2 of Table 9.3.4.3.2 of the Reconfiguring a lot code, or the non-compliance doesn't increase the lot yieldIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Emerging community zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 if creating one or more additional lots, unless (a) in accordance with an approved plan of development forming part of a variation approval or (b) for emergency services, water cycle management infrastructure, a telecommunications facility or electricity infrastructureIf not met: a development application with code assessment. Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Community facilities zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
District centre zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Environmental management and conservation zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
High impact industry zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Industry zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Limited development zone Needs a development application (impact assessment — neighbours can make submissions) Table 5.5.1 if creating one or more additional lots, unless for emergency services, water cycle management infrastructure, a telecommunications facility or electricity infrastructureIf not met: a development application with code assessment. Survey plan; Infrastructure charges; Operational worksAssessed against: The planning scheme
Local centre zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Major centre zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Neighbourhood centre zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Open space zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Principal centre zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Rural zone Needs a development application (code assessment) Table 5.5.1 if the new lots comply with the minimum lot size in Column 2 of Table 9.3.4.3.2 of the Reconfiguring a lot codeIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Special purpose zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Specialised centre zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code
Sport and recreation zone Needs a development application (code assessment) Table 5.5.1 'All zones' row — code assessment where not made impact assessable elsewhere in Table 5.5.1 Survey plan; Infrastructure charges; Operational worksAssessed against: Applicable zone code, Reconfiguring a lot code, Landscaping code, Nuisance code, Transport and parking code, Works, services and infrastructure code

Overlays that change the answer

The table above is the base case, before any overlay. Flood, bushfire, landslide, heritage and character overlays are the usual reasons a normally-accepted project becomes a development application — add your address above and the tool flags the ones that apply to your lot.

Worth knowing in Bundaberg

Bundaberg Regional Council Planning Scheme 2015 (Version 6.6, effective 31 July 2026), Part 5. A material change of use is impact assessable unless the table says otherwise or the use isn't listed; reconfiguring a lot is code assessable unless Table 5.5.1 says impact (Low density residential, Rural and Rural residential below the minimum lot size; Emerging community and Limited development zones generally); building and operational work are accepted unless the tables say otherwise (section 5.3.2). Accepted development subject to requirements that doesn't meet the nominated acceptable outcomes becomes code assessable (section 5.3.3). A dwelling house includes a secondary dwelling (granny flat); Schedule 6 of the Planning Regulation 2017 can make a dwelling house accepted regardless of these tables. Building work for a dwelling house (sheds, extensions, pools, fences) is accepted subject to the Dwelling house code and Transport and parking code in all zones (Table 5.6.1); a building approval under the Building Act is still needed. Vegetation clearing that isn't 'exempt vegetation clearing' (Schedule 1) is code assessable against the Vegetation management code in every zone (Table 5.7.1); state Vegetation Management Act rules apply separately. Excavation or filling over 50 m³ (or filling over 10 m³ / 150 mm average depth, or excavation deeper than 1 m) is code assessable unless on Rural zoned land for a rural activity. Minimum lot sizes live in Table 9.3.4.3.2 of the Reconfiguring a lot code, which isn't in Part 5. Precincts: Medium density residential MDRZ1 (Bundaberg West medical/health hub) and MDRZ2 (Barolin Street office precinct); Principal centre PCZ2 (City centre riverfront) and PCZ3 (City centre frame); Limited development LDZ1 (Limited residential); District centre rows differ for Childers and Gin Gin; Local centre short-term accommodation/resort rows apply in Bargara. Community facilities zone: a use annotated on the zone map is accepted (footprint unchanged) or code assessable. Special purpose zone: development in the Bundaberg State Development Area is decided by the Coordinator-General and Strategic Port Land by the Port Authority. Local plan: the Bundaberg Health and Enterprise Precinct local plan (Table 5.8.1, Emerging community zone land) overrides the zone — in its Low-Medium Density Residential Precinct a dwelling house, dual occupancy and home based business are accepted subject to requirements and a multiple dwelling of up to three dwellings on a lot of at least 600 m² is accepted subject to requirements (code otherwise); in its Medium-High Density Residential Precinct dual occupancy, home based business and multiple dwelling are code assessable; shops, cafés and offices are accepted subject to requirements or code assessable in the Health and Knowledge Sub-Precincts; reconfiguring a lot is code assessable in its Health and Knowledge, residential and Parkland precincts. Overlays (Table 5.9.1): most overlays only add the overlay code as a benchmark without changing the category (acid sulfate soils, agricultural land, biodiversity areas, bushfire hazard, coastal management district/erosion prone area/setback line, extractive transport route, gas pipeline and electricity buffers, steep land, water resource catchments). Overlays that do change the category are in overlay_triggers: airport operational airspace, public safety area and building restricted area; sea turtle sensitive area (over-height development becomes impact); extractive resource/processing and separation areas; flood hazard (not for a dwelling house); local heritage places and neighbourhood character areas (alterations and demolition become code assessable); and infrastructure buffers (wastewater, waste, road/rail/cane rail corridors). The airport lighting and wildlife hazard buffers make specific uses (putrescible waste, aquaculture, abattoirs, intensive animal industry, showgrounds, constructed waterbodies) code assessable, and excavation or filling in a flood hazard area, gas pipeline buffer or on steep land becomes code assessable. Where premises are in more than one zone, local plan or overlay, the highest category applies to the part affected.

What Bundaberg Regional Council publishes

These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Minimum lot size and frontage: Low density residential zone
In the Low density residential zone the minimum lot size is 600 m2 with a 15 metre minimum frontage in a sewered area, and 1,500 m2 with a 20 metre minimum frontage where not sewered. (Applies to: Low density residential zone (Reconfiguring a lot code, Table 9.3.4.3.2); lot size excludes access strips in rear lots.) Bundaberg Regional Council Planning Scheme 2015, Version 6.7 (effective 28 August 2026), Part 9 Reconfiguring a lot code
Small lots
The minimum lot size and dimensions in the Low density residential and Medium density residential zones may be varied by a plan of development that complies with the assessment benchmarks for small lot housing. (Applies to: Low density residential zone and Medium density residential zone.) Bundaberg Regional Council Planning Scheme 2015, Version 6.7 (effective 28 August 2026), Part 9 Reconfiguring a lot code
Rear (hatchet) lots
For a rear (hatchet) lot, the area not counting the access strip has to meet the zone minimum lot size, and the access strip gradient is not to exceed 10%. (Applies to: Rear (hatchet) lots, acceptable outcome AO8 of the Reconfiguring a lot code.) Bundaberg Regional Council Planning Scheme 2015, Version 6.7 (effective 28 August 2026), Part 9 Reconfiguring a lot code
Infrastructure charge per new lot
From 1 July 2026 the infrastructure charge for reconfiguring a lot is $38,029.25 per lot, equal to the adopted charge for a dwelling house with 3 or more bedrooms. (Applies to: Each new lot that places demand on trunk infrastructure (2026/27 adopted charge).) Bundaberg Regional Council Charges Resolution (No. 9) 2026, with Schedule 1 updated for 2026/27 (from 01/07/2026)
Infrastructure charge discount for smaller lots
Residential lots get an infrastructure charge discount by lot size: 5% for 650 to 700 m2, 10% for 600 to 649 m2, 20% for 500 to 599 m2, 25% for 400 to 499 m2 and 30% under 400 m2. (Applies to: Reconfiguring a lot for residential lots (Charges Resolution No. 9, Table 2 discounts).) Bundaberg Regional Council Charges Resolution (No. 9) 2026, with Schedule 1 updated for 2026/27 (from 01/07/2026)
Development application fee 2026-27
The 2026/27 fee for a code assessable reconfiguring a lot application creating 1 to 10 lots is $4,545. (Applies to: Code assessable reconfiguration creating 2 or more lots (1 to 10 lots); impact assessable applications are the code fee plus 40%.) Bundaberg Regional Council Fees and Charges 2026/27
Subdivision plan approval fee 2026-27
The 2026/27 fee for council approval of a subdivision plan is $1,670 where the reconfiguring a lot was assessable development with no related operational works approval, and $2,395 where there is a related operational works approval. (Applies to: Approval of subdivision plans (all plan types).) Bundaberg Regional Council Fees and Charges 2026/27

The statewide rules

These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.

Minimum lot size
There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
One lot into two
Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
Neighbour submissions
An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
How long an approval lasts
An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
Council sign-off on the survey plan
Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
Infrastructure charges
Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
Registering the plan
Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
Near a state road or railway
An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
Rural land in South East Queensland
In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
What needs no application
Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
  • The dollar figures are the 2026-27 amounts and change each 1 July.
  • Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

More about Bundaberg

Other projects in Bundaberg

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Subdivide in Queensland.

Read from the Bundaberg Regional Council Planning Scheme 2015 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.