landbrief.

Subdividing land in Logan — do you need approval?

Logan City Council's planning scheme — the Logan Planning Scheme 2015 (version 9.2, with TLPI No. 1/2024) — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

Needs a development application (code assessment). Subdividing needs a code assessable development application if every new lot meets your precinct's minimum size (from 300 m² in the Small lot precinct to 4,000 m² in the Acreage precinct); smaller lots need an impact assessable development application.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Reconfiguring a lot. Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low density residential zone Needs a development application (code assessment) Table 5.6.1 all proposed lots meet the precinct minimum — Small lot 300 m²; Suburban 400 m² (rear lots 500 m²); Village 500 m² (rear lots 600 m²); Large suburban 1,000 m²; Small acreage 2,000 m²; Acreage 4,000 m² — or reconfiguring an existing or approved multiple dwelling; a local plan's code (and Loganholme's own lot sizes) also applies; a one-into-two subdivision the Planning Regulation (Schedule 10, Part 12) makes code assessable stays code assessable (Table 5.4.2)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Low-medium density residential zone Needs a development application (code assessment) Table 5.6.1 all proposed lots are at least 500 m² in the Townhouse precinct or 800 m² in the Apartment precinct, or reconfiguring an existing or approved multiple dwelling; Loganholme and Loganlea local plans set their own minimums; a one-into-two subdivision the Planning Regulation (Schedule 10, Part 12) makes code assessable stays code assessable (Table 5.4.2)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Medium density residential zone Minimum new lot 1,200 m² Needs a development application (code assessment) Table 5.6.1 all proposed lots are 1,200 m² or greater, or reconfiguring an existing or approved multiple dwelling; the Loganlea local plan sets its own minimums; a one-into-two subdivision the Planning Regulation (Schedule 10, Part 12) makes code assessable stays code assessable (Table 5.4.2)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Rural residential zone Needs a development application (code assessment) Table 5.6.1 all proposed lots meet the precinct minimum — Park residential 5,000 m²; Park living 100 ha; Cottage rural or Carbrook 20 ha in the urban footprint or 100 ha in the regional landscape and rural production area; a one-into-two subdivision the Planning Regulation (Schedule 10, Part 12) makes code assessable stays code assessable (Table 5.4.2)If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Emerging community zone Minimum new lot 20 ha Needs a development application (code assessment) Table 5.6.1 if all proposed lots are 20 hectares or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Centre zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Community facilities zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Environmental management and conservation zone Minimum new lot 100 ha Needs a development application (code assessment) Table 5.6.1 if a proposed lot is 100 hectares or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Low impact industry zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Medium impact industry zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Mixed use zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Recreation and open space zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Rural zone Minimum new lot 100 ha Needs a development application (code assessment) Table 5.6.1 if all proposed lots are 100 hectares or greaterIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Special purpose zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code
Specialised centre zone Needs a development application (code assessment) Table 5.6.1 zone not listed in Table 5.6.1 — the 'any other reconfiguring a lot' row applies; a local plan code also applies inside a local plan area Survey plan; Infrastructure charges; Operational worksAssessed against: 9.4.2 Filling and excavation code, 9.4.3 Infrastructure code, 9.4.4 Landscape code, 9.4.6 Reconfiguring a lot code, 9.4.7 Servicing, access and parking code

Overlays that change the answer

  • Flood hazard overlay. A dwelling house or auxiliary unit becomes code assessable in a High flood risk area or Flood investigation area (and must meet flood-level outcomes of the Dual occupancy and Dwelling house code in a Moderate flood risk area or Low flood island); other uses that would be accepted become code assessable in a High or Moderate flood risk area or Flood investigation area; house building work over 25 m², in a High flow area or enclosing an undercroft in a High flood risk area must meet the Dual occupancy and Dwelling house code; filling or excavation over 20 m³ or 2,000 m² in a flood risk area is code assessable; subdivision and home-based businesses add the Flood hazard overlay code. (Table 5.10.5.1 Flood hazard overlay map OM-05.00)

Worth knowing in Logan

Logan Planning Scheme 2015, version 9.2 (with TLPI No. 1/2024), effective 1 July 2025, Part 5. A material change of use is impact assessable unless the table says otherwise or the use isn't listed; reconfiguring a lot is code assessable unless Table 5.6.1 says otherwise; building work and operational work are accepted unless the tables say otherwise (s5.3.2). Accepted development subject to requirements that misses an acceptable outcome becomes code assessable (s5.3.3(2)). Every zone and local plan table has an 'all uses' row: new building work over the zone/precinct/local plan height limit makes otherwise accepted or code assessable development impact assessable (dwelling houses are excluded in most residential zones). Dwelling house (which includes a secondary dwelling) is accepted development (not subject to requirements) in the Emerging community, Environmental management and conservation, Low density, Low-medium density, Medium density residential, Rural and Rural residential zones, but accepted subject to the Dual occupancy and Dwelling house code where the lot is in a residential area on the Residential overlay (OM-10.00). Logan also lists 'Dual occupancy (auxiliary unit)' — a granny-flat style second dwelling — as accepted subject to requirements in those zones (Apartment/Townhouse precincts only in Low-medium density); planners should confirm whether a given granny flat is treated as a secondary dwelling or an auxiliary unit. Building work for a dwelling house, including extensions and ancillary class 10 buildings and structures (sheds, carports, pools), is accepted subject to the Dual occupancy and Dwelling house code in all zones (Table 5.7.1); demolition is not listed so is accepted unless the Heritage overlay applies. A building approval under the Building Act is still needed. Minimum lot sizes come from Table 5.6.1 and vary by precinct in the Low density, Low-medium density and Rural residential zones. A one-into-two subdivision in a residential or industry zone that Schedule 10, Part 12 of the Planning Regulation makes code assessable is code assessable regardless (Table 5.4.2). Local plans (s5.9) override the zone tables (s5.3.2(8)) and their tables are comprehensive (zone + local plan combined): Beenleigh, Browns Plains, Jimboomba, Logan Central, Logan Village, Loganholme, Loganlea, Park Ridge, Shailer Park and Springwood. Most cover Centre zone land with their own precincts (e.g. Centre core, Civic and community, Integrated health, Showgrounds) and generally make centre uses accepted subject to requirements in existing buildings, otherwise code; dwelling houses are not listed in most of them. Loganholme local plan (Table 5.9.6.1) covers residential precincts (Large lot residential, Suburban residential, Residential choice, Residential frame, Residential core): a dwelling house is accepted; a non-auxiliary dual occupancy is accepted subject to requirements on a corner lot in the Residential choice/frame precincts or on an 800 m² lot in the Suburban residential precinct; townhouses are code assessable in the Residential choice and Suburban residential precincts (≤25 dwellings/ha); home businesses are limited to one non-resident employee. Its reconfiguring a lot table (5.9.6.2) makes lots under 1,000 m² (Large lot residential) or 400 m² / 40 m frontage (Suburban residential), and under 600/800/1,200 m² in the Residential choice/frame/core precincts, impact assessable. Loganlea local plan (Tables 5.9.7.1–5.9.7.2) covers Low-medium and Medium density residential land: a dwelling house is accepted; a dual occupancy is code assessable (auxiliary unit accepted subject to requirements) only in the Residential edge and Residential frame precincts; multiple dwellings are code assessable by precinct; lots under 600 m² (Residential edge), 800 m² (Residential frame/core) or 1,200 m² (Low-medium, Mixed use) are impact assessable. For all local plans, reconfiguring a lot also triggers the local plan code (Table 5.9.11.1), and an off-premises sign in the Logan Village local plan is impact assessable (Table 5.9.12.1). Overlays override zones and local plans (s5.3.2(8)). Acid sulfate soils, Bushfire hazard, Extractive resources, Greenbank training area buffer, Regional infrastructure corridors and substations, Strategic airport and environs and Water resource catchments overlays don't change the category for these projects but add their overlay code to assessable or accepted-subject-to-requirements development other than a dwelling house or auxiliary unit; the Water resource catchments overlay makes animal husbandry, animal keeping and cropping code assessable; the Transport noise corridors overlay has no table (it only triggers building requirements under the Queensland Development Code MP 4.4). Operational work: driveway crossovers are accepted subject to the Servicing, access and parking code; filling or excavation over 20 m³ (urban zones) or 100 m³ (rural and environmental zones), or retaining walls over 1 m, need the Filling and excavation code, and are code assessable over 1.5 m (3 m benched). Vegetation clearing is accepted in all zones except where the Biodiversity areas or Waterway corridors and wetlands overlay applies; state Vegetation Management Act rules apply separately. Schedule 6 of the Planning Regulation can make a dwelling house, community residence or forestry-for-wood cropping accepted regardless of these tables (Table 5.4.1). Defence land in the Special purpose zone is not subject to the scheme. Source caveat: the Medium impact industry zone table (5.5.9.1) was split across two PDF chunks and its row for bulk landscape supplies/agricultural supplies is partly garbled; it lists no dwelling house, dual occupancy, home-based business or multiple dwelling rows.

What Logan City Council publishes

These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Minimum lot size and frontage, Suburban precinct
In the Suburban precinct of the Low density residential zone, the Logan Planning Scheme sets a minimum lot size of 400 square metres and a minimum frontage of 12.5 metres (10 metres for a cul-de-sac lot and 15 metres for a corner lot). (Applies to: Low density residential zone, Suburban precinct.) Logan Planning Scheme 2015 version 9.2, section 9.4.6 Reconfiguring a lot code (Logan City Council, effective 1 July 2025)
Minimum lot size and frontage, Small lot precinct
In the Small lot precinct of the Low density residential zone, the Logan Planning Scheme sets a minimum lot size of 300 square metres and a minimum frontage of 10 metres (6 metres for a cul-de-sac lot and 12 metres for a corner lot). Rear lots are not created in this precinct. (Applies to: Low density residential zone, Small lot precinct.) Logan Planning Scheme 2015 version 9.2, section 9.4.6 Reconfiguring a lot code (Logan City Council, effective 1 July 2025)
Minimum lot size and frontage, Village precinct
In the Village precinct of the Low density residential zone, the Logan Planning Scheme sets a minimum lot size of 500 square metres and a minimum frontage of 15 metres (10 metres for a cul-de-sac lot and 18 metres for a corner lot). (Applies to: Low density residential zone, Village precinct.) Logan Planning Scheme 2015 version 9.2, section 9.4.6 Reconfiguring a lot code (Logan City Council, effective 1 July 2025)
Rear lots and impact assessment, Suburban precinct
Logan City Council says a reconfiguring a lot application in the Suburban precinct of the Low density residential zone is impact assessable if a proposed lot is less than 400 square metres or a proposed rear lot is less than 500 square metres. (Applies to: Low density residential zone, Suburban precinct.) Reconfiguring a lot (Logan City Council web page, fetched 2026-11-18)
Development application fee (2026-27)
The 2026/27 Logan City Council fee for a code assessable reconfiguring a lot development application is a $5,060 base fee plus $1,055 per lot. (Applies to: Code assessable reconfiguring a lot, standard or volumetric.) Register of Cost-Recovery Fees and Schedule of Commercial and other Charges 2026/27 (Logan City Council)
Plan sealing fee (2026-27)
The 2026/27 Logan City Council survey plan sealing fee is $927 per lot. (Applies to: Survey plan endorsement for standard format, building format and volumetric plans.) Register of Cost-Recovery Fees and Schedule of Commercial and other Charges 2026/27 (Logan City Council)
Infrastructure charge per lot
Logan City Council's adopted infrastructure charge for reconfiguring a lot is $38,029.25 for each lot under the charges resolution that took effect on 9 November 2026. (Applies to: Each lot created by reconfiguring a lot.) Logan Charges Resolution (No. 13) 2026 (Logan City Council, effect from 9 November 2026)

The statewide rules

These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.

Minimum lot size
There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
One lot into two
Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
Neighbour submissions
An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
How long an approval lasts
An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
Council sign-off on the survey plan
Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
Infrastructure charges
Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
Registering the plan
Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
Near a state road or railway
An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
Rural land in South East Queensland
In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
What needs no application
Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
  • The dollar figures are the 2026-27 amounts and change each 1 July.
  • Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

More about Logan

Other projects in Logan

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Subdivide in Queensland.

Read from the Logan Planning Scheme 2015 (version 9.2, with TLPI No. 1/2024) tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.