landbrief.

Subdividing land in Townsville — do you need approval?

Townsville City Council's planning scheme — the Townsville City Plan — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

Needs a development application (code assessment). Subdividing land in the Low density residential zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes).

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Reconfiguring a lot. Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low density residential zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Low density residential zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Low density residential zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Medium density residential zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Medium density residential zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Medium density residential zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
High density residential zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the High density residential zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: High density residential zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Character residential zone Needs a development application (code assessment) Table 5.6.1 if not in the Inter-war to 1950s asymmetrical gable, Interwar gables and Queensland bungalows, or Queenslanders precinct; or in one of those precincts and each lot created is at least 500 m²If not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Character residential zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Rural residential zone Minimum new lot 4,000 m² Needs a development application (code assessment) Table 5.6.1 if each lot created is at least 4,000 m², or at least 4 ha on land in the Water resource catchment overlayIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Rural residential zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Emerging community zone Minimum new lot 10 ha Needs a development application (code assessment) Table 5.6.1 if each lot created is at least 10 ha, or in the Burdell precinctIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Emerging community zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Community facilities zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Community facilities zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Community facilities zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
District centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the District centre zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: District centre zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Environmental management and conservation zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Environmental management and conservation zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Environmental management and conservation zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
High impact industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the High impact industry zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: High impact industry zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Local centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Local centre zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Local centre zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Low impact industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Low impact industry zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Low impact industry zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Major centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Major centre zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Major centre zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Medium impact industry zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Medium impact industry zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Medium impact industry zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Mixed use zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Mixed use zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Mixed use zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Neighbourhood centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Neighbourhood centre zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Neighbourhood centre zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Open space zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Open space zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Open space zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Principal centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Principal centre zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Principal centre zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Rural zone Needs a development application (code assessment) Table 5.6.1 if each lot created is at least: 40 ha in the Horticulture precinct; 40 ha in the Mixed farming precinct (400 ha with the Water resource catchment overlay); 400 ha in the Grazing precinct; 10 ha in the Jensen or Cungulla precinctIf not met: a development application with impact assessment (neighbours can make submissions). Survey plan; Infrastructure charges; Operational worksAssessed against: Rural zone code, Reconfiguring a lot code, Healthy waters code, Transport impact, access and parking code, Works code
Special purpose zone It depends — see below Table 5.6.1 in the Townsville State Development Area Survey plan; Infrastructure charges; Operational worksAssessed against: Development Scheme for the Townsville State Development Area
Specialised centre zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Specialised centre zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Specialised centre zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code
Sport and recreation zone Needs a development application (code assessment) Table 5.6.1 Subdividing land in the Sport and recreation zone needs a code assessable development application, assessed against the zone code and the Reconfiguring a lot code (which sets lot sizes). Survey plan; Infrastructure charges; Operational worksAssessed against: Sport and recreation zone code, Reconfiguring a lot code, Healthy waters code, Landscape code, Transport impact, access and parking code, Works code

Overlays that change the answer

  • Water resource catchment overlay. The code-assessable minimum lot size rises to 4 ha in the Rural residential zone and 400 ha in the Rural zone Mixed farming precinct; smaller lots are impact assessable. (Table 5.6.1)
  • Major infrastructure and hazardous facilities overlay — stock route network. A dwelling house becomes code assessable unless in the Low density or Character residential zone; any other change of use, reconfiguring a lot and operational work become code assessable. (Table 5.9.1 Major infrastructure and hazardous facilities overlay)

Worth knowing in Townsville

Townsville City Plan (Version 2025/01), Part 5, converted from the council's Part 5 PDF (not an official copy). A material change of use not listed in a zone table, or not meeting the listed description, is impact assessable; reconfiguring a lot is code assessable unless Table 5.6.1 says otherwise; building work and operational work are accepted unless Tables 5.7 / 5.8 or an overlay say otherwise (section 5.3.2). Accepted development subject to requirements that doesn't meet its requirements becomes code assessable (section 5.3.3(2)). Townsville regulates building work in Table 5.7.1 only in the Character residential zone (contributing character buildings and work near the street façade — see SC6.2); elsewhere building work is regulated only through overlays (heritage, flood, coastal). A building approval under the Building Act is always still needed. Granny flats: only the Low density and Rural residential zones split out a 'secondary dwelling' (accepted subject to requirements); the Rural and Emerging community zones cap a lot at two dwellings. Dual occupancy is accepted in the Low (outside the Stables precinct), Medium and High density and Character residential zones. Schedule 6 of the Planning Regulation 2017 overrides the scheme — e.g. a dwelling house in a residential zone (other than Medium or High density) can't be made assessable unless a relevant overlay applies; the Major infrastructure and hazardous facilities overlay isn't a relevant overlay, so its dwelling-house triggers don't apply in the Low density or Character residential zones. Many centre, mixed use and medium density rows vary by precinct (e.g. Table 5.5.3 storey limits of 2–8 storeys by precinct for multiple dwellings in the Medium density residential zone; Breakwater, Thuringowa centre support, Civic and administration, James Cook University–Townsville University Hospital precincts) — check the conditions. Local plans are not used in this scheme. The Special purpose zone covers the Townsville State Development Area, where change of use, subdivision and vegetation clearing are decided by the Coordinator-General. Operational work filling or excavation within 1.5 m of a boundary deeper than 300 mm, deeper than 1 m, or 100 m³ or more is code assessable in every zone (10 m³ in the high/medium flood hazard area). Where premises are in more than one zone or overlay, the highest category applies to the affected part. The Transport noise corridor overlay is for information only. The source Part 5 extract was a PDF conversion: Table 5.5.12 (Specialised centre) splits across chunks and the Table 5.8.2 advertising-device extract is incomplete.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

More about Townsville

Other projects in Townsville

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Subdivide in Queensland.

Read from the Townsville City Plan tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.