Subdividing land in Banana — do you need approval?
Banana Shire Council's planning scheme — the Banana Shire Planning Scheme 2021 — decides whether a subdivision needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.
In a general residential zone code
Needs a development application (code assessment). Subdividing residential land needs a development application assessed against the code if lots meet the minimum size, otherwise impact assessment applies.
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
Zone by zone
Reconfiguring a lot. Residential zones first.
| Zone | What the table says | Conditions | What you'll need |
|---|---|---|---|
| General Residential Zone Code | Needs a development application (code assessment) Table 4.1.2 / Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6 (one into two per Schedule 12 is code)If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Schedule 12, Part 3 of the Regulation, Table 6.3.6 minimum lot areas |
| Rural Residential Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Table 6.3.6 minimum lot areas |
| Township Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot size in Table 6.3.6If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Table 6.3.6, Development Design Code – Table 6.3.2 |
| Centre Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6 of the Reconfiguring a Lot CodeIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Development Design Code – Table 6.3.2, Reconfiguring a Lot Code – Table 6.3.6 |
| Community Facilities Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6 of the Reconfiguring a Lot CodeIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Development Design Code – Table 6.3.2, Reconfiguring a Lot Code – Table 6.3.6 |
| Environmental Management and Conservation Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6 of the Reconfiguring a Lot CodeIf not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Development Design Code – Table 6.3.2, Reconfiguring a Lot Code – Table 6.3.6 |
| Industry Zone Code | Needs a development application (code assessment) Table 4.1.2 / Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6 of the Reconfiguring a Lot Code (one-into-two under Schedule 12 is code assessable)If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Schedule 12, Part 3 of the Regulation, Reconfiguring a Lot Code – Table 6.3.5, Development Design Code – Table 6.3.2 |
| Mixed Use Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Development Design Code – Table 6.3.2, Table 6.3.6 minimum lot areas |
| Recreation and Open Space Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot area in Table 6.3.6If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Table 6.3.6 minimum lot areas |
| Rural Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot size in Table 6.3.6If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Table 6.3.6, Development Design Code – Table 6.3.2 |
| Special Industry Zone Code | Needs a development application (code assessment) Table 4.3.1 | if all new lots meet the minimum lot size in Table 6.3.6If not met: a development application with impact assessment (neighbours can make submissions). | Survey plan; Infrastructure charges; Operational worksAssessed against: Reconfiguring a Lot Code – Table 6.3.5, Table 6.3.6, Development Design Code – Table 6.3.2 |
Overlays that change the answer
- Local heritage place. Building work for alteration, extension, partial demolition or a new building on a local heritage place is code assessable (Local Heritage Place Code – Table 6.3.10). Minor building work on a heritage place is accepted subject to requirements, or code assessable where not accepted. Building work (other than minor) adjoining a heritage place is code assessable. Any permanent alteration to the appearance of a heritage place is code assessable, and operational work (including clearing) and reconfiguring a lot on a heritage place site is code assessable. (Tables 4.1.1, 4.1.3, 4.1.4, 4.3.1, 4.5.1)
Worth knowing in Banana
Minimum lot sizes are not listed in the Tables of Assessment — they are in Table 6.3.6 of the Reconfiguring a Lot Code, which was not provided. For every zone, subdividing is code assessable where resulting lots meet the minimum lot areas of Table 6.3.6, and impact assessable where any lot does not comply (Table 4.3.1). Amalgamation of lots and creation of an access easement to one lot are accepted/ADSR in all zones. MUIRS ROAD PRECINCT (Rural Zone): the accepted and accepted-subject-to-requirements MCU pathways in Table 4.1.1, the accepted/ADSR earthworks and minor-electricity operational-work pathways, and some other concessions do NOT apply in this precinct; building work in the Muirs Road Precinct not associated with a material change of use is code assessable against the Rural Zone Code. COMMUNITY FACILITIES ZONE Precinct 6: operational work for a municipal waste facility is accepted. Zone-specific material change of use categories (granny_flat, dual_occupancy, home_business, townhouses, shop_office, etc.) are set by the individual zone codes in Part 5, which were not supplied here — rules for those uses will rely on each zone code's table of assessment and default/'any other use' rows. A building approval under the Building Act may still be required even where planning assessment is 'accepted'.
What Banana Shire Council publishes
These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.
- Rear lots
- A rear lot can be accessed by an access strip with a minimum width of 3.5 metres. (Applies to: Rear (battle-axe) lots.) Banana Shire Council Planning Scheme 2021, Part 6 Development Codes, Reconfiguring a Lot Code, PO14
- Application fee 2026-27
- The 2026-27 reconfiguring a lot application fee for a subdivision of 1 to 5 lots is $2,142.00 if code assessable or $2,946.00 if impact assessable. (Applies to: Subdivisions of 1 to 5 lots, boundary realignments and access easements.) Fees and Charges 2026/27 (Banana Shire Council)
- Survey plan endorsement fee 2026-27
- The 2026-27 fee for endorsement of a survey plan (Form 18) is $944.00 per survey plan. (Applies to: Survey plans lodged with Council.) Fees and Charges 2026/27 (Banana Shire Council)
- Infrastructure charge per lot
- The adopted infrastructure charge for reconfiguring a lot is $10,882 for each additional lot, under Charges Resolution (No. 2) 2025, which has effect from 1 September 2025. (Applies to: Each additional lot; 100% applies in the Biloela and Moura priority infrastructure area.) Charges Resolution (No. 2) 2025 (Banana Shire Council, adopted 28 August 2025, effect from 1 September 2025), Table 1
The statewide rules
These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.
- Minimum lot size
- There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
- One lot into two
- Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
- Neighbour submissions
- An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
- How long an approval lasts
- An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
- Council sign-off on the survey plan
- Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
- Infrastructure charges
- Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
- Registering the plan
- Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
- Near a state road or railway
- An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
- Rural land in South East Queensland
- In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
- What needs no application
- Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
- The dollar figures are the 2026-27 amounts and change each 1 July.
- Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.
- Planning Regulation 2017, Schedule 12 — one lot into two requiring code assessment
- Planning Regulation 2017, Schedule 6, section 21 — reconfigurations a scheme can't make assessable
- Planning Regulation 2017, Schedule 16 — prescribed amounts for infrastructure charges
- Planning Regulation 2017, Schedule 18 — approving plans of subdivision
- Planning Regulation 2017, Schedule 10 — state transport corridors (Part 9) and the South East Queensland regional plan (Part 16)
- Planning Act 2016, sections 53 (public notification) and 85 (when an approval lapses)
- Land Title Act 1994, section 50 — requirements for registering a plan of subdivision
- Titles Queensland — Titles Registry fees 2026-27
What else you'll need
- Survey plan
- Infrastructure charges
- Operational works
More about Banana
- What can you build in Banana? Council overview and development applications
- Every Queensland zone explained, with what each council allows and the planning overlays that change the answer
- What Banana Shire Council charges for a development application, compared with other councils
- A Landbrief site report for your Banana address — every planning layer that applies to the lot
Other projects in Banana
Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish
The statewide position on this project: Subdivide in Queensland.
Read from the Banana Shire Planning Scheme 2021 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.