Do I need council approval to demolish a building in Queensland?
Short answer
Usually no planning approval needed. Demolishing a building needs a building approval, normally from a private certifier. A development application to the council is usually not needed — unless a local heritage or traditional-building character overlay applies, which is the common reason demolition is assessable.
Check your own property
Add the address, or choose your council, to see the answer for your zone. Different project?
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
The approvals, notices and asbestos rules
These apply across Queensland. Whether the council also needs to approve the demolition depends on your address: a heritage listing or a character overlay in the planning scheme is what brings it in.
- Building approval
- Demolishing a building is building work under the Building Act 1975, so it needs a building approval from a private certifier or the council. The regulation's list of work that needs no approval has no entry for demolishing a house.
- Time limits
- Once a demolition approval is given, the work must substantially start within 2 months and be finished within 1 year.
- Local heritage places
- Development on a place in a council's local heritage register is assessable across Queensland, so demolishing one needs a development application to the council.
- Character and pre-war housing areas
- There is no statewide rule. A council's planning scheme decides whether demolishing an older house in a character area needs a development application. Where a scheme does make demolishing a home assessable, a private certifier must hold the building approval documents for 5 business days before giving them to the applicant.
- State heritage places
- Any development on a place in the Queensland Heritage Register needs a development approval assessed by the State, unless an exemption certificate has been given. Exemption certificates are for work with little or no effect on the place.
- Asbestos: licensed removal
- A contractor needs an asbestos removal licence to remove more than 10 m² of bonded (non-friable) asbestos, and a class A licence for any friable asbestos. Asbestos must be removed before demolition starts, as far as is reasonably practicable.
- Asbestos: doing it yourself
- A homeowner can remove up to 10 m² of bonded asbestos. More than 10 m² needs a certificate from a Queensland Health-approved course. A homeowner can never remove friable asbestos.
- Notice to Workplace Health and Safety Queensland
- The contractor must give written notice at least 5 days before demolishing a structure that is at least 6 m high, or any demolition that uses load-shifting machinery on a suspended floor or explosives.
- Sewer and water
- Sealing the sewer drain of an existing building is notifiable plumbing work, done by a licensed plumber or drainer. Councils and water providers set their own disconnection steps and fees.
- A building approval for demolition and a development application are separate. A certifier can't replace the council's decision where the planning scheme or a heritage listing requires one.
- Building Act 1975, sections 5 (building work), 20 (assessable building work), 71 (time limits for demolition) and 88 (the 5 business day hold)
- Planning Regulation 2017, Schedule 10, sections 14 (local heritage places) and 15 (Queensland heritage places)
- Work Health and Safety Regulation 2011, sections 142 (notice of demolition work), 452, 458, 485 and 487 (asbestos)
- Public Health Regulation 2018, sections 7 and 8 — asbestos removal by homeowners
- Homeowner's certificate to remove asbestos — Queensland Government
- Plumbing and Drainage Regulation 2019, Schedule 1 — notifiable work
The Queensland position
Building work, including demolition, is assessable under the Building Act, so you need a building approval. The planning side is usually accepted development unless a local heritage or traditional-building character overlay applies, which is the common reason demolition needs a development application. Building approval: yes, in nearly every case (from a private certifier). Planning approval from the council: usually not, unless an overlay applies or the siting breaks the scheme.
What usually happens: a building approval for the demolition, and a check for heritage or character protection first.
What else you'll need
- Building approval
By council
These councils' own tables of assessment, read zone by zone:
- Demolish in Banana
- Demolish in Brisbane
- Demolish in Bundaberg
- Demolish in Cairns
- Demolish in Central Highlands
- Demolish in Gold Coast
- Demolish in Moreton Bay
- Demolish in Fraser Coast
- Demolish in Gladstone
- Demolish in Ipswich
- Demolish in Livingstone
- Demolish in Logan
- Demolish in Mackay
- Demolish in Noosa
- Demolish in Redland
- Demolish in Rockhampton
- Demolish in Scenic Rim
- Demolish in Sunshine Coast
- Demolish in Toowoomba
- Demolish in Townsville
Common questions
- Do I need council approval to demolish a house in Queensland?
- You need a building approval for the demolition, normally from a private certifier. A development application is usually not needed unless a local heritage or character overlay applies to the house.
- Can I demolish a pre-1946 house?
- In many councils, houses built before 1946 sit in a traditional building character overlay and demolition needs a development application. Check the overlay for your address before you book the excavator.
- What about asbestos?
- Asbestos has to come out before the demolition, as far as is reasonably practicable. A contractor needs an asbestos removal licence for more than 10 m² of bonded asbestos and a class A licence for any friable asbestos. This is separate from the planning and building approvals.
- Can I remove asbestos myself before demolishing?
- A homeowner can remove up to 10 m² of bonded (non-friable) asbestos. For more than 10 m² you need a certificate from a Queensland Health-approved course. Friable asbestos can only be removed by a class A licence holder.
- How long do I have to demolish once it is approved?
- Under the Building Act 1975 the work must substantially start within 2 months of the building approval and be finished within 1 year.