Do I need council approval to subdivide my land in Queensland?

Short answer

Needs a development application. Subdividing — the planning term is reconfiguring a lot — always needs a development application. The usual pattern is code assessment when every new lot meets the zone's minimum lot size, and impact assessment (with neighbour submissions) when it doesn't. Roads, water and sewer works and infrastructure charges follow.

Check your own property

Add the address, or choose your council, to see the answer for your zone. Different project?

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

The rules, timeframes and costs

These apply across Queensland. The minimum lot size and frontage come from the zone in your council's planning scheme, and an overlay can change how an application is assessed, so check your council and your address before you rely on them.

Minimum lot size
There is no statewide minimum. Each zone in each council's planning scheme sets its own, along with a minimum street frontage.
One lot into two
Statewide, splitting one lot into two is code assessable (no neighbour submissions) when the lot is in a residential or industry zone, it is not a rear lot, each new lot meets the zone's minimum size, and no overlay or flood, bushfire, landslide, storm tide or erosion-prone area covers any part of the land. Park residential and rural residential zones are excluded.
Neighbour submissions
An impact assessable application is publicly notified, and submissions stay open for at least 15 business days.
How long an approval lasts
An approval to reconfigure a lot lapses unless the survey plan is given to the council for approval within 4 years of the approval taking effect, or within the period the approval itself states.
Council sign-off on the survey plan
Titles Queensland can't register a plan that divides a lot until the council has approved it. The council must approve a plan that meets the criteria (the approval's conditions met or secured, no rates or charges owing, the plan matching the approval) and give notice within 20 business days.
Infrastructure charges
Councils charge for each new lot. From 1 July 2026 the most a council can charge is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Each council adopts its own charge up to that cap, and its charges resolution says how a vacant new lot is counted.
Registering the plan
Titles Queensland's 2026-27 fee to lodge a survey plan is $496.12, plus $36.49 for each lot on the plan.
Near a state road or railway
An application that adds a lot within 25 m of a state-controlled road, a railway or another state transport corridor is also referred to the State for assessment.
Rural land in South East Queensland
In the Regional Landscape and Rural Production Area of the South East Queensland regional plan, subdividing is prohibited unless every new lot is at least 100 hectares or the subdivision is one of the listed exemptions.
What needs no application
Joining two or more lots into one (amalgamation) is not assessable, and neither is a building format plan that doesn't divide the land itself. A scheme can't require an application for either.
  • The dollar figures are the 2026-27 amounts and change each 1 July.
  • Surveying, the roads and services the council's conditions require, and the council's own application and plan-sealing fees come on top. Council fees are on each council's page below.

The Queensland position

Reconfiguring a lot — splitting one lot into two or more — always needs a development application. The common pattern is code assessment where every new lot meets the zone's minimum lot size, and impact assessment where it doesn't. Some reconfigurations are exempt, such as amalgamating lots or certain building format plans.

What usually happens: a development application, then operational works for roads and services, a survey plan, and infrastructure charges for each new lot.

What else you'll need

  • Survey plan
  • Infrastructure charges
  • Operational works

By council

These councils' own tables of assessment, read zone by zone:

Common questions

Do I need council approval to subdivide my land in Queensland?
Yes. Reconfiguring a lot — splitting one lot into two or more — needs a development application. It is commonly code assessable where each new lot meets the zone's minimum size, and impact assessable when it doesn't. Some reconfigurations are exempt, such as amalgamating lots or certain building format plans.
What is the minimum lot size to subdivide?
It is set by the zone in your council's planning scheme, and it differs a lot: a few hundred square metres in residential zones, hectares in rural zones. Frontage, slope and whether sewer is available also matter.
What else do I pay for when I subdivide?
Beyond the application fee: a surveyor, operational works for roads and services, infrastructure charges to the council for each new lot, and often water and sewer headworks. The council fee is usually the small part.
How much are infrastructure charges on a subdivision?
Each council sets its own charge for a new lot, up to a statewide cap. From 1 July 2026 the cap is $38,029.25 for a home of 3 or more bedrooms and $27,163.80 for a home of 2 or fewer. Many councils charge at or near the cap. The charge is usually payable before the council signs the survey plan.
How long does a subdivision approval last?
4 years, unless the approval states a different period. Under the Planning Act 2016 the approval lapses if the survey plan hasn't been given to the council for its approval by then.
Can I subdivide a corner block or a battle-axe lot?
Possibly — the scheme looks at frontage, access and the shape of each new lot, not only its area. A site report or a town planner can tell you whether your lot's shape works.

Other projects

Granny flatDual occupancyShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.