Demolishing a building in Livingstone — do you need approval?

Livingstone Shire Council's planning scheme — the Livingstone Planning Scheme 2018 — decides whether demolition needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

No planning approval needed. Demolition is accepted building work not listed in the table, so no planning development application is needed (a building approval is still required).

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Building work (demolition). Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low Density Residential Zone No planning approval needed Table 5.6.1 Demolition is accepted building work not listed in the table, so no planning development application is needed (a building approval is still required). Building approval
Low-Medium Density Residential Zone No planning approval needed Table 5.6.1 Demolition is accepted building work not listed in the table, so no planning development application is needed (a building approval is still required). Building approval
Medium Density Residential Zone No planning approval needed Table 5.6.1 Demolition is accepted building work not listed in the table, so no planning development application is needed (a building approval is still required). Building approval
Emerging Community Zone No planning approval needed Table 5.6.1 Demolition is not singled out in the building work table so it is accepted development under the scheme, though a building approval and overlay checks may still apply. Building approval
Rural Residential Zone No planning approval needed Table 5.6.1 Demolition is not separately listed so it is accepted development under the scheme, though a building approval is still required. Building approval
Township Zone No planning approval needed Table 5.6.1 Demolition is not separately listed so it is accepted development under the scheme, though a building approval is still required. Building approval
Community Facilities Zone No planning approval needed Table 5.6.1 Demolition is accepted building work needing no planning application (a building approval is still required) unless an overlay applies. Building approval
District Centre Zone No planning approval needed Table 5.6.1 Demolition is not listed in the building work table, so it is accepted development under the scheme, but a building approval and any overlay/heritage check may still apply. Building approval
Environmental Management and Conservation Zone No planning approval needed Table 5.6.1 Demolition is accepted building work needing no planning application (a building approval is still required) unless an overlay applies. Building approval
Limited Development Zone No planning approval needed Table 5.6.1 Demolition is not singled out in the building work table so it is accepted development under the scheme, though a building approval and overlay checks may still apply. Building approval
Local Centre Zone No planning approval needed Table 5.6.1 Demolition is not listed in the building work table, so it is accepted development under the scheme, but a building approval and any overlay/heritage check may still apply. Building approval
Low Impact Industry Zone No planning approval needed Table 5.6.1 Demolition is accepted building work needing no planning application (a building approval is still required) unless an overlay applies. Building approval
Major Centre Zone No planning approval needed Table 5.6.1 Demolition is not listed in the building work table, so it is accepted development under the scheme, but a building approval and any overlay/heritage check may still apply. Building approval
Major Tourism Zone No planning approval needed Table 5.6.1 Demolition is accepted development under the planning scheme (not listed as needing a planning application), but a building approval is still needed. Building approval
Medium Impact Industry Zone No planning approval needed Table 5.6.1 Demolition is accepted building work needing no planning application (a building approval is still required) unless an overlay applies. Building approval
Neighbourhood Centre Zone No planning approval needed Table 5.6.1 Demolition is not listed in the building work table, so it is accepted development under the scheme, but a building approval and any overlay/heritage check may still apply. Building approval
Open Space Zone No planning approval needed Table 5.6.1 Demolition is not separately listed so it is accepted development under the scheme, though a building approval is still required. Building approval
Rural Zone No planning approval needed Table 5.6.1 Demolition is not separately listed so it is accepted development under the scheme, though a building approval is still required. Building approval
Special Purpose Zone No planning approval needed Table 5.6.1 Demolition is not singled out in the building work table so it is accepted development under the scheme, though a building approval and overlay checks may still apply. Building approval
Specialised Centre Zone No planning approval needed Table 5.6.1 Demolition is not singled out in the building work table so it is accepted development under the scheme, though a building approval and overlay checks may still apply. Building approval
Sport and Recreation Zone No planning approval needed Table 5.6.1 Demolition is accepted building work not listed in the table, so no planning development application is needed (a building approval is still required). Building approval

Overlays that change the answer

  • Acid Sulfate Soils Overlay. Below 20m AHD, building work, reconfiguring a lot, operational work or a material change of use becomes code assessable where it involves excavation of 100m³ or more of soil/sediment, or filling of land below 5m AHD with 500m³ or more of fill at an average depth of 0.5m or more. (Table 5.9.1)
  • Coastal Hazard Overlay. Within the erosion prone area or storm tide hazard area, a dwelling house/MCU and reconfiguring a lot become code assessable in the circumstances set out; building work (new/extension/fill/secondary dwelling) becomes accepted subject to requirements of the coastal hazard overlay code. (Table 5.9.5)
  • Flood Hazard Overlay. Within the flood hazard overlay, a dwelling house/MCU and reconfiguring a lot become code assessable in the circumstances set out; building work (new/extension/fill/secondary dwelling) becomes accepted subject to the requirements of the flood hazard overlay code. (Table 5.9.7)
  • Heritage Place Overlay. Within or adjacent to a State or local heritage site (distance triggers of 5–50m by site), MCU, reconfiguring a lot, building work and operational work become accepted subject to requirements or code assessable, particularly where features/trees are altered, removed or demolished. (Table 5.9.8)
  • Scenic Amenity Overlay. Within scenic amenity management areas, coastal green break, coastal scenic transport route or coastline foreshore overlays, building work and MCU that are accepted become accepted subject to requirements (and code assessment escalates); reconfiguring a lot becomes code assessable; certain clearing/earthwork/advertising become ASR or code assessable. (Table 5.9.10)

Worth knowing in Livingstone

Minimum lot sizes shown are the ToA thresholds above which creating additional lots is code assessable; below those thresholds reconfiguring is impact assessable (the Reconfiguring a Lot Code Table 9.3.3.4.2 sets the detailed minimum lot areas/dimensions/frontages, which was not fully reproduced here). Note precinct variations: Rural Residential (Park Residential Precinct 4000m² vs 2ha elsewhere); Rural Zone (Capricorn Coast Rural Precinct 10ha, Class A/B Agricultural Land 60ha, otherwise 150ha); Rural and Township zones have a Yaamba Historic Township Precinct that changes dwelling house/building work categories. For shop_office the three uses (Shop, Food and drink outlet, Office) can differ — e.g. in centre zones a Shop/Food and drink outlet is often accepted/ASR if within an existing building but code assessable if a new building or drive-through, while in Township and Specialised Centre zones these uses are generally code assessable. The Seaspray Local Plan overrides the underlying zone for dwelling house, dual occupancy and building work within its precincts (dwelling house and dual occupancy are accepted subject to requirements). Overlays only change categories to the extent the premises is affected by the overlay, and overlay effects do not apply where the relevant overlay code's accepted-development acceptable outcomes are met. A separate building approval under the Building Act is required for building work even where planning categorises it as accepted. State Vegetation Management Act rules operate separately from the scheme's clearing provisions.

What Livingstone Shire Council publishes

These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Building approval
A building approval is needed to remove or demolish a building. The approval is current for 12 months, so the demolition is to be completed in that period. (Applies to: All buildings in Livingstone Shire.) Demolitions and Removal Information Sheet (Livingstone Shire Council, undated)
Development application trigger
Whether demolition needs a development application depends on the planning scheme overlays that apply to the property. (Applies to: Properties affected by planning scheme overlays.) Demolitions and Removal Information Sheet (Livingstone Shire Council, undated)
Service disconnection
In a sewered area, water supply and sanitary drainage can be disconnected as notifiable work if not connected to a combined sanitary drain. In a non-sewered area, or with a combined drain, a plumbing application to Council is needed before work starts. (Applies to: Sewered and non-sewered properties.) Demolitions and Removal Information Sheet (Livingstone Shire Council, undated)
Building application fee 2026-27
The 2026-27 council fee for a demolition or removal from site is $599.00 for all classes of buildings, including lodgement, assessment and one inspection. (Applies to: All classes of buildings, where Council is the building certifier.) Fees & Charges 2026/27, effective 1 July 2026 (Livingstone Shire Council)
Asbestos disposal
Asbestos cannot go in rubbish or recycling bins or to Council transfer stations. It must be taken to a certified waste facility. (Applies to: All asbestos waste in Livingstone Shire.) Asbestos (Livingstone Shire Council web page)
Asbestos disposal fee 2026-27
The 2026-27 charge at Yeppoon landfill for non-friable asbestos generated within the Shire is $423.00 per tonne. (Applies to: Non-friable asbestos generated within Livingstone Shire, Yeppoon landfill.) Fees & Charges 2026/27, effective 1 July 2026 (Livingstone Shire Council)

The statewide rules

These apply across Queensland. Whether the council also needs to approve the demolition depends on your address: a heritage listing or a character overlay in the planning scheme is what brings it in.

Building approval
Demolishing a building is building work under the Building Act 1975, so it needs a building approval from a private certifier or the council. The regulation's list of work that needs no approval has no entry for demolishing a house.
Time limits
Once a demolition approval is given, the work must substantially start within 2 months and be finished within 1 year.
Local heritage places
Development on a place in a council's local heritage register is assessable across Queensland, so demolishing one needs a development application to the council.
Character and pre-war housing areas
There is no statewide rule. A council's planning scheme decides whether demolishing an older house in a character area needs a development application. Where a scheme does make demolishing a home assessable, a private certifier must hold the building approval documents for 5 business days before giving them to the applicant.
State heritage places
Any development on a place in the Queensland Heritage Register needs a development approval assessed by the State, unless an exemption certificate has been given. Exemption certificates are for work with little or no effect on the place.
Asbestos: licensed removal
A contractor needs an asbestos removal licence to remove more than 10 m² of bonded (non-friable) asbestos, and a class A licence for any friable asbestos. Asbestos must be removed before demolition starts, as far as is reasonably practicable.
Asbestos: doing it yourself
A homeowner can remove up to 10 m² of bonded asbestos. More than 10 m² needs a certificate from a Queensland Health-approved course. A homeowner can never remove friable asbestos.
Notice to Workplace Health and Safety Queensland
The contractor must give written notice at least 5 days before demolishing a structure that is at least 6 m high, or any demolition that uses load-shifting machinery on a suspended floor or explosives.
Sewer and water
Sealing the sewer drain of an existing building is notifiable plumbing work, done by a licensed plumber or drainer. Councils and water providers set their own disconnection steps and fees.
  • A building approval for demolition and a development application are separate. A certifier can't replace the council's decision where the planning scheme or a heritage listing requires one.

What else you'll need

  • Building approval

More about Livingstone

Other projects in Livingstone

Granny flatDual occupancySubdivideShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear trees

The statewide position on this project: Demolish in Queensland.

Read from the Livingstone Planning Scheme 2018 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.