Demolishing a building in Central Highlands — do you need approval?
Central Highlands Regional Council's planning scheme — the Central Highlands Regional Council Planning Scheme 2016 (Amendment No. 7) — decides whether demolition needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.
In a general residential zone
No planning approval needed. Demolition is accepted development under the planning scheme unless an overlay (such as heritage) applies, but a building approval for demolition is still needed.
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
Zone by zone
Building work (demolition). Residential zones first.
| Zone | What the table says | Conditions | What you'll need |
|---|---|---|---|
| General residential zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless an overlay (such as heritage) applies, but a building approval for demolition is still needed. | Building approval |
| High density residential zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless an overlay (such as heritage) applies, but a building approval for demolition is still needed. | Building approval |
| Rural residential zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless an overlay (such as heritage) applies, but a building approval for demolition is still needed. | Building approval |
| Emerging community zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless an overlay (such as heritage) applies, but a building approval for demolition is still needed. | Building approval |
| Township zone | Accepted if you meet the requirements Table 5.6.1 | minor building workIf not met: a development application with code assessment. | Building approval |
| Centre zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless a heritage or other overlay applies, though a building approval is still needed. | Building approval |
| Community facilities zone | No planning approval needed Table 5.6.1 | Demolition is accepted development unless a heritage overlay applies, though a building approval is still required. | Building approval |
| Environmental management and conservation zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the scheme unless a heritage overlay applies, though a building approval is still required. | Building approval |
| Industry investigation zone | Accepted if you meet the requirements Table 5.6.1 | minor building work / not otherwise listedIf not met: a development application with code assessment. | Building approval |
| Industry zone | Accepted if you meet the requirements Table 5.6.1 | minor building work / not otherwise listedIf not met: a development application with code assessment. | Building approval |
| Low impact industry zone | Accepted if you meet the requirements Table 5.6.1 | minor building work / not otherwise listedIf not met: a development application with code assessment. | Building approval |
| Neighbourhood centre zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless a heritage or other overlay applies, though a building approval is still needed. | Building approval |
| Principal centre zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless a heritage or other overlay applies, though a building approval is still needed. | Building approval |
| Recreation and open space zone | No planning approval needed Table 5.6.1 | Demolition is accepted development unless a heritage overlay applies, though a building approval is still required. | Building approval |
| Rural zone | No planning approval needed Table 5.6.1 | Demolition is accepted development unless a heritage overlay applies, though a building approval is still required. | Building approval |
| Special industry zone | Accepted if you meet the requirements Table 5.6.1 | minor building work / not otherwise listedIf not met: a development application with code assessment. | Building approval |
| Specialised centre zone | No planning approval needed Table 5.6.1 | Demolition is accepted development under the planning scheme unless a heritage or other overlay applies, though a building approval is still needed. | Building approval |
Overlays that change the answer
- Flood hazard overlay. Within a flood risk category the category of development can change. A dwelling house (incl. secondary dwelling) material change of use / building work in the Balance Flood Risk Category is accepted only where the habitable floor is at least 300mm above natural ground level and no filling is involved; in the Low Risk Flood Category dwelling house / dwelling unit / dual occupancy / home based business is accepted only where habitable floor is at least Defined Flood Event + 300mm and no filling. Building work in Medium/High/Very High flood risk categories becomes code assessable. Reconfiguring a lot in any flood risk category is code assessable. Multiple dwelling (townhouses) in Medium/High/Very High flood risk categories becomes impact assessable. Otherwise code assessable unless accepted conditions met. (Table 5.8.1 Overlays — Flood hazard overlay)
- Bushfire hazard overlay. Where within a medium, high, very high or potential impact buffer bushfire hazard area, building work involving a dwelling house, a listed material change of use (accommodation, business, industry, community, recreation activity groups) and reconfiguring a lot must be assessed against the Bushfire hazard overlay code (no change to category but overlay code applies as accepted requirements). (Table 5.8.1 Overlays — Bushfire hazard overlay)
- Heritage overlay. Building work not associated with a material change of use that involves alteration, demolition, relocation or removal of a local heritage place becomes code assessable (against Heritage overlay code) where it would otherwise be accepted subject to requirements. A material change of use involving a local heritage place resulting in such building work also becomes code assessable. Applies to premises that are, or adjoin, a local heritage place. (Table 5.8.1 Overlays — Heritage overlay)
Worth knowing in Central Highlands
Minimum lot sizes, frontages and rectangular developable areas for each zone are set in Table 8.4.3.3.2 (Minimum lot size and dimensions), which was not reproduced in the supplied material, so numeric minimums could not be captured; the Reconfiguring a lot code (section 8.4.3) and Table 8.2.2 govern subdivision of one lot into two. Under the Regulation, subdivision of one lot into two lots is always code assessable (Schedule 10). The Rural zone contains Gemfields Core, Gemfields Frame and Gemfields Balance precincts which materially change the category of assessment for many uses (e.g. dwelling unit, shop, office, food and drink outlet, community uses) — owners in those precincts should check precinct-specific rows. Building work for a dwelling house and Class 10a outbuildings is generally accepted or accepted subject to requirements across all zones (and fully accepted for Class 10a in the Rural zone outside the Gemfields precincts); a building approval under the Building Act 1975 is still required separately. Development that is accepted does not need a development application. Home-based business is accepted subject to requirements in most zones provided it is not a high impact home-based business activity. Where a use is not listed for a zone the 'all other uses / undefined use' row applies, making it impact assessable. Overlay effects apply only to the part of the premises affected, and the highest applicable category prevails where zone and overlay differ. State Vegetation Management Act clearing controls operate separately from the scheme's operational work provisions.
What Central Highlands Regional Council publishes
These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.
- Removal and demolition fee 2026-27
- The 2026-27 council building fees for removal or demolition are a $180.00 archival fee plus an application, assessment and processing fee that is price on application, including one inspection. (Applies to: Removal or demolition, including removal from the original site, where Council is the building certifier.) 2026-27 Fees and Charges, effective 1 July 2026 (Central Highlands Regional Council)
- Re-site security bond 2026-27
- A security bond of $20,000.00 applies to re-siting an existing Class 1 building (a house), or $10,000.00 on a rural lot. (Applies to: Re-site of an existing Class 1 building.) 2026-27 Fees and Charges, effective 1 July 2026 (Central Highlands Regional Council)
- Asbestos disposal fee 2026-27
- The 2026-27 landfill charge for asbestos is $356.50 per tonne. Written approval from Council is needed before disposal, with at least 48 hours notice, and only asbestos from within the council area is accepted. (Applies to: Asbestos from within the Central Highlands Regional Council area.) 2026-27 Fees and Charges, effective 1 July 2026 (Central Highlands Regional Council)
The statewide rules
These apply across Queensland. Whether the council also needs to approve the demolition depends on your address: a heritage listing or a character overlay in the planning scheme is what brings it in.
- Building approval
- Demolishing a building is building work under the Building Act 1975, so it needs a building approval from a private certifier or the council. The regulation's list of work that needs no approval has no entry for demolishing a house.
- Time limits
- Once a demolition approval is given, the work must substantially start within 2 months and be finished within 1 year.
- Local heritage places
- Development on a place in a council's local heritage register is assessable across Queensland, so demolishing one needs a development application to the council.
- Character and pre-war housing areas
- There is no statewide rule. A council's planning scheme decides whether demolishing an older house in a character area needs a development application. Where a scheme does make demolishing a home assessable, a private certifier must hold the building approval documents for 5 business days before giving them to the applicant.
- State heritage places
- Any development on a place in the Queensland Heritage Register needs a development approval assessed by the State, unless an exemption certificate has been given. Exemption certificates are for work with little or no effect on the place.
- Asbestos: licensed removal
- A contractor needs an asbestos removal licence to remove more than 10 m² of bonded (non-friable) asbestos, and a class A licence for any friable asbestos. Asbestos must be removed before demolition starts, as far as is reasonably practicable.
- Asbestos: doing it yourself
- A homeowner can remove up to 10 m² of bonded asbestos. More than 10 m² needs a certificate from a Queensland Health-approved course. A homeowner can never remove friable asbestos.
- Notice to Workplace Health and Safety Queensland
- The contractor must give written notice at least 5 days before demolishing a structure that is at least 6 m high, or any demolition that uses load-shifting machinery on a suspended floor or explosives.
- Sewer and water
- Sealing the sewer drain of an existing building is notifiable plumbing work, done by a licensed plumber or drainer. Councils and water providers set their own disconnection steps and fees.
- A building approval for demolition and a development application are separate. A certifier can't replace the council's decision where the planning scheme or a heritage listing requires one.
- Building Act 1975, sections 5 (building work), 20 (assessable building work), 71 (time limits for demolition) and 88 (the 5 business day hold)
- Planning Regulation 2017, Schedule 10, sections 14 (local heritage places) and 15 (Queensland heritage places)
- Work Health and Safety Regulation 2011, sections 142 (notice of demolition work), 452, 458, 485 and 487 (asbestos)
- Public Health Regulation 2018, sections 7 and 8 — asbestos removal by homeowners
- Homeowner's certificate to remove asbestos — Queensland Government
- Plumbing and Drainage Regulation 2019, Schedule 1 — notifiable work
What else you'll need
- Building approval
More about Central Highlands
- What can you build in Central Highlands? Council overview and development applications
- Every Queensland zone explained, with what each council allows and the planning overlays that change the answer
- What Central Highlands Regional Council charges for a development application, compared with other councils
- A Landbrief site report for your Central Highlands address — every planning layer that applies to the lot
- Development applications in Emerald
- Development applications in Blackwater
- Development applications in Capella
- Development applications in Comet
- Development applications in Springsure
- Development applications in Rolleston
- Development applications in Mackenzie
- Development applications in Bluff
Other projects in Central Highlands
Granny flatDual occupancySubdivideShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear trees
The statewide position on this project: Demolish in Queensland.
Read from the Central Highlands Regional Council Planning Scheme 2016 (Amendment No. 7) tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.