Demolishing a building in Fraser Coast — do you need approval?

Fraser Coast Regional Council's planning scheme — the Fraser Coast Planning Scheme 2014 (Version 11) — decides whether demolition needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a low density residential zone

No planning approval needed. Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Building work (demolition). Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
Low density residential zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Medium density residential zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
High density residential zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Rural residential zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Emerging community zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Community facilities zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
District centre zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Environmental management and conservation zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
High impact industry zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Limited development (constrained land) zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Local centre zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Low impact industry zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Medium impact industry zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Mixed use zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Neighbourhood centre zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Open space zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Principal centre zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Rural zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Specialised centre zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Sport and recreation zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval
Waterfront and marine industry zone No planning approval needed Table 5.8.1; section 5.3.2(3) Demolition isn't listed in the building work table, so it is accepted development unless a heritage place, neighbourhood character area or demolition control area applies; a demolition building approval is still needed. Building approval

Overlays that change the answer

Worth knowing in Fraser Coast

Fraser Coast Planning Scheme 2014 (Version 11), Part 5, converted from the council PDF (not an official copy). A material change of use is impact assessable unless the table says otherwise or the use isn't listed (section 5.3.2(1)); reconfiguring a lot is code assessable in every zone except that creating extra lots in the Emerging community and Limited development (constrained land) zones is impact assessable (Table 5.7.1); building work and operational work are accepted unless the tables say otherwise (section 5.3.2(3)). Table 5.8.1 makes building work for a dwelling house, a dual occupancy or a domestic outbuilding on a vacant lot accepted subject to requirements (Dwelling house code / Dual occupancy code) in the Low, Medium and High density residential, Rural, Rural residential and Emerging community zones and in Mixed use Precinct MU1 sub-precinct 2; the table's heading is 'building work associated with a material change of use', so applying it to sheds and extensions on an existing house is an inference. Pools, fences and demolition aren't listed, so they are accepted unless an overlay applies. A building approval under the Building Act is still needed in all cases. Unusually, a dual occupancy is accepted development (no development application) in the Low density residential zone outside Precinct LDR1 and in the Medium density residential zone. A dwelling house (which includes a granny flat) is accepted in the Low, Medium and High density residential, Emerging community, Rural and Rural residential zones, code assessable in the Limited development (constrained land) zone and Mixed use Precinct MU6, and not listed (impact) in centre, industry, recreation and community facilities zones. The Mixed use zone has no zone-wide table: it is split into Precincts MU1 (Urangan Harbour, with sub-precincts 1–11), MU2 (Hervey Bay Airport Business and Industry Park), MU3 (Carriers Arms Hotel), MU4 (Dominion Flour Mill), MU5 (Fraser Island Resorts) and MU6 (Maryborough Residential Airpark), so several answers there are 'varies'. Other precincts: LDR1, HDR1 (Hervey Bay tourism nodes), LII1 (City Reach), MII1 (Hervey Bay entrance, where industry becomes code assessable). Local plans (Tables 5.6.1 Maryborough and 5.6.2 Pialba principal activity centres) override the Principal centre zone and Community facilities zone in their precincts — e.g. residential uses become impact assessable in the Maryborough retail focus and riverfront and Pialba retail core precincts, and offices become impact assessable in the Maryborough inner-city residential and riverfront precincts. Accepted development subject to requirements that doesn't meet the listed acceptable outcomes becomes code assessable (section 5.3.3(2)). Schedule 6 of the Planning Regulation 2017 can make a dwelling house in a residential zone or a community residence accepted regardless of these tables (Table 5.4.1), and subdividing one lot into two in a residential or industry zone is code assessable under Schedule 10 (Table 5.4.2). Overlays override zone and local plan categories (section 5.3.2(8)). Several overlays (acid sulfate soils, agricultural land, extractive resources, infrastructure buffers, water resource catchments) don't change the category but add their overlay code as a benchmark for assessable development. Part 5 states no numeric minimum lot sizes; those are in the zone codes and the Reconfiguring a lot code.

What Fraser Coast Regional Council publishes

These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Demolition control area
Building work that involves demolition, relocation or removal of a Victorian, Federation or interwar dwelling house in a demolition control area is assessable development under the planning scheme. (Applies to: Demolition control area shown on the Heritage and neighbourhood character overlay map.) Fraser Coast Planning Scheme 2014 (Version 11), Part 5 Tables of assessment
Local heritage place: demolition
Building work involving demolition, relocation or removal of a local heritage place is subject to impact assessment under the planning scheme. (Applies to: Local heritage places shown on the Heritage and neighbourhood character overlay map.) Fraser Coast Planning Scheme 2014 (Version 11), Part 5 Tables of assessment
Demolition application fees 2026-27
The 2026-27 base fee for a building work development application to demolish, relocate or remove a heritage place is $4,545 (impact assessment). (Applies to: Development permit for building work applications involving a State or local heritage place.) Fraser Coast Regional Council Schedule of Fees and Charges 2026-27 (amended 26 August 2026)
Demolition control area fee 2026-27
The 2026-27 base fee for a code assessable building work application to demolish, relocate or remove a Victorian, Federation or interwar dwelling house in a demolition control area is $1,494. (Applies to: Development permit for building work applications in a demolition control area.) Fraser Coast Regional Council Schedule of Fees and Charges 2026-27 (amended 26 August 2026)
Removal house: concurrence agency referral
Removing or relocating a house from one allotment to another needs an application for concurrence agency referral to the council and its approval first. (Applies to: Existing dwellings moved from one allotment to another in the Fraser Coast region.) Amenity and aesthetics policies (Fraser Coast Regional Council web page)
Asbestos disposal at council tips
In 2026-27, wrapped and sealed asbestos of less than 10 m2 or 100 kg from properties in the Fraser Coast council area costs $27 per visit. Larger loads cost $169.50 per tonne and need a Waste Transport Certificate. (Applies to: Asbestos generated from properties within the Fraser Coast Regional Council area; an address is required.) Fraser Coast Regional Council Schedule of Fees and Charges 2026-27 (amended 26 August 2026)

The statewide rules

These apply across Queensland. Whether the council also needs to approve the demolition depends on your address: a heritage listing or a character overlay in the planning scheme is what brings it in.

Building approval
Demolishing a building is building work under the Building Act 1975, so it needs a building approval from a private certifier or the council. The regulation's list of work that needs no approval has no entry for demolishing a house.
Time limits
Once a demolition approval is given, the work must substantially start within 2 months and be finished within 1 year.
Local heritage places
Development on a place in a council's local heritage register is assessable across Queensland, so demolishing one needs a development application to the council.
Character and pre-war housing areas
There is no statewide rule. A council's planning scheme decides whether demolishing an older house in a character area needs a development application. Where a scheme does make demolishing a home assessable, a private certifier must hold the building approval documents for 5 business days before giving them to the applicant.
State heritage places
Any development on a place in the Queensland Heritage Register needs a development approval assessed by the State, unless an exemption certificate has been given. Exemption certificates are for work with little or no effect on the place.
Asbestos: licensed removal
A contractor needs an asbestos removal licence to remove more than 10 m² of bonded (non-friable) asbestos, and a class A licence for any friable asbestos. Asbestos must be removed before demolition starts, as far as is reasonably practicable.
Asbestos: doing it yourself
A homeowner can remove up to 10 m² of bonded asbestos. More than 10 m² needs a certificate from a Queensland Health-approved course. A homeowner can never remove friable asbestos.
Notice to Workplace Health and Safety Queensland
The contractor must give written notice at least 5 days before demolishing a structure that is at least 6 m high, or any demolition that uses load-shifting machinery on a suspended floor or explosives.
Sewer and water
Sealing the sewer drain of an existing building is notifiable plumbing work, done by a licensed plumber or drainer. Councils and water providers set their own disconnection steps and fees.
  • A building approval for demolition and a development application are separate. A certifier can't replace the council's decision where the planning scheme or a heritage listing requires one.

What else you'll need

  • Building approval

More about Fraser Coast

Other projects in Fraser Coast

Granny flatDual occupancySubdivideShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear trees

The statewide position on this project: Demolish in Queensland.

Read from the Fraser Coast Planning Scheme 2014 (Version 11) tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.