Ipswich City Council's planning scheme — the Ipswich City Plan 2025 — decides whether demolition needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.
In a low density residential zone
No planning approval needed. Demolition is generally accepted unless a character or heritage overlay applies, though you still need a building approval.
I don't know my zone — choose my council instead
The zone is on your rates notice, or a Landbrief site report will find it for you.
Zone by zone
Building work (demolition). Residential zones first.
| Zone | What the table says | Conditions | What you'll need |
|---|---|---|---|
| Low Density Residential Zone | No planning approval needed Table 5.7.1 | unless a character or heritage overlay applies | Building approval |
| Low-Medium Density Residential Zone | No planning approval needed Table 5.7.1 | unless a character or heritage overlay applies | Building approval |
| Medium Density Residential Zone | Accepted if you meet the requirements Table 5.7.1 / 5.3.2(4) | unless an overlay applies (e.g. character overlay)If not met: a development application with code assessment. | Building approval |
| High Density Residential Zone | Accepted if you meet the requirements Table 5.7.1 / 5.3.2(4) | unless an overlay applies (e.g. character overlay)If not met: a development application with code assessment. | Building approval |
| Character Residential Zone | Accepted if you meet the requirements Table 5.7.1 / 5.9.3 | unless the Character Places and Areas Overlay applies; demolition of a pre-1946 building (other than class 10) may be impact assessableIf not met: a development application with impact assessment (neighbours can make submissions). | Building approvalAssessed against: Character Places and Areas Overlay Code |
| Township Zone | Accepted if you meet the requirements Table 5.7.1 / 5.3.2(4) | unless an overlay applies (e.g. character overlay)If not met: a development application with code assessment. | Building approval |
| Emerging Community Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted development with no planning development application needed unless a character or heritage overlay applies, though a building approval is still required. | Building approval |
| Community Facilities Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted development under the planning scheme unless an overlay applies, but a building approval is still needed. | Building approval |
| Conservation Zone | No planning approval needed Table 5.3.2(4) | Demolishing a building is accepted development unless an overlay (such as character) applies, though a building approval under the Building Act is still required. | Building approval |
| District Centre Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted (no planning application) unless an overlay such as character applies, though a building approval is still required. | Building approval |
| Environmental Management Zone | No planning approval needed Table 5.3.2(4) | Demolishing a building is accepted development unless an overlay (such as character) applies, though a building approval under the Building Act is still required. | Building approval |
| Industry Investigation Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted development under the planning scheme unless an overlay applies, but a building approval is still needed. | Building approval |
| Limited Development Zone | No planning approval needed Table 5.7.1 | Demolishing a building is generally accepted development needing no planning application unless an overlay applies, though a building approval is still required. | Building approval |
| Local Centre Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted (no planning application) unless an overlay such as character applies, though a building approval is still required. | Building approval |
| Low Impact Industry Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted building work with no planning development application unless a character or heritage overlay applies, though a building approval is still required. | Building approval |
| Major Centre Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted (no planning application) unless an overlay such as character applies, though a building approval is still required. | Building approval |
| Medium Impact Industry Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted building work with no planning development application unless a character or heritage overlay applies, though a building approval is still required. | Building approval |
| Neighbourhood Centre Zone | No planning approval needed Table 5.7.1 | unless a character or heritage overlay applies | Building approval |
| Principal Centre Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted (no planning application) unless an overlay such as character applies, though a building approval is still required. | Building approval |
| Recreation and Open Space Zone | No planning approval needed Table 5.3.2(4) | Demolishing a building is accepted development unless an overlay (such as character) applies, though a building approval under the Building Act is still required. | Building approval |
| Rural Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted development with no planning development application unless a character or heritage overlay applies, though a building approval is still required. | Building approval |
| Special Purpose Zone | No planning approval needed Table 5.3.2(4) | Demolishing a building is accepted development unless an overlay (such as character) applies, though a building approval under the Building Act is still required. | Building approval |
| Specialised Centre Zone | No planning approval needed Table 5.7.1 | unless a character or heritage overlay applies | Building approval |
| Tourism Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted development under the planning scheme unless an overlay applies, but a building approval is still needed. | Building approval |
| Tourist Accommodation Zone | No planning approval needed Table 5.7.1 | Demolition is generally accepted development under the planning scheme unless an overlay applies, but a building approval is still needed. | Building approval |
Overlays that change the answer
- Biodiversity Overlay (Matters of Environmental Significance). A dwelling house or dual occupancy in a residential zone on a lot under 1,000m² (or wholly within an approved development envelope, or exempt clearing) stays accepted; otherwise, where works damage or remove native vegetation/wildlife habitat in a Matter of Environmental Significance, the development becomes code assessable (needs a development application). Building work on an existing building stays accepted. All reconfiguring a lot is code assessable. Clearing native vegetation in a MES area is code assessable against the Biodiversity Overlay Code. (Table 5.9.1)
- Waterway Corridors and Wetlands Overlay. Development wholly within an approved development envelope (or a home-based business for MCU) stays accepted; otherwise building work and material change of use are accepted subject to requirements, becoming code assessable if the overlay code's required outcomes are not met. All reconfiguring a lot is code assessable. Clearing native vegetation in a waterway corridor/wetland is assessable against the overlay code. (Table 5.9.2)
- Character Places and Areas Overlay. In Local Character Areas, a dwelling house (including secondary dwelling) or dual occupancy involving building work becomes code assessable. Other building work is accepted subject to requirements. Demolition of a pre-1946 building (other than a class 10 building) is impact assessable (needs a development application with public notification); demolition of a pre-1946 class 10 building is code assessable. All reconfiguring a lot is code assessable. For individual places of local significance / Schedule 7 listings, all building work other than demolishing an ordinary class 10 building is code assessable and pre-1946/listed demolition is impact assessable. (Table 5.9.3)
- Flood Risk and Overland Flow Overlay (Extreme/High/Medium Risk). Building work such as enclosing the ground floor of an existing dwelling/dual occupancy, minor building work, or a class 10 building (shed, carport, pool, fence) is accepted subject to requirements against the Flood Overlay Code; all other building work is code assessable. A new dwelling/dual occupancy (material change of use) is code assessable unless within an approved development envelope. All reconfiguring a lot is code assessable. (Table 5.9.10 (Extreme, High and Medium Risk Areas))
- Flood Risk and Overland Flow Overlay (Overland Flow Area). A class 10 building or minor building work is accepted subject to requirements; other building work is code assessable unless within an approved development envelope. All reconfiguring a lot is code assessable. (Table 5.9.10 (Overland Flow Area))
- Regional Infrastructure Overlay (Gas/Oil corridor, Major Electricity or Major Transport Corridor). A dwelling house, dual occupancy or home-based business, and building work for a dwelling/dual occupancy, a class 10 building or minor building work, is accepted subject to requirements against the Regional Infrastructure Overlay Code; other building work is code assessable. Reconfiguring a lot that increases lot numbers or realigns boundaries is code assessable. (Table 5.9.11)
- Extractive Resources Overlay. A class 10 building, building work on an existing building, or minor building work is accepted; other building work is code assessable. All reconfiguring a lot is code assessable. (Table 5.9.12)
- Water Resource Catchments Overlay. A dwelling house, dual occupancy or home-based business (material change of use) is accepted subject to requirements; ALL building work is accepted subject to requirements against the Water Resource Catchment Overlay Code. Reconfiguring a lot creating additional lots in a water supply buffer or catchment area is code assessable. (Table 5.9.14)
- Strategic Airports and Defence Activities Overlay. Most development is accepted subject to requirements against the overlay code. An extension to an existing dwelling house (excluding a secondary dwelling) stays accepted in several sub-areas. Within higher ANEF noise contours certain sensitive uses and offices/industry become code assessable. (Table 5.9.6)
- Mining Influence Areas Overlay. A class 10 building or minor building work is accepted; other building work within the Mining Influence Area is code assessable. A material change of use not including building works is accepted; otherwise code assessable. All reconfiguring a lot is code assessable. (Table 5.9.7)
- Bushfire Prone Areas Overlay. Building work for a dwelling house or dual occupancy stays accepted. For material change of use, a dwelling house on a lot over 2,000m² or a dual occupancy is accepted subject to requirements against the Bushfire Overlay Code (lots under 2,000m² are exempt under the Regulation). All reconfiguring a lot is code assessable. (Table 5.9.8)
- Difficult Topography and Landslide Overlay. On land with slope greater than 15%, building work and material change of use are accepted subject to requirements against the overlay code, becoming code assessable if the required outcomes are not met; reconfiguring a lot on such land is code assessable. (Table 5.9.9)
Worth knowing in Ipswich
This is a first-pass summary; per-project per-zone rules follow in the second pass. Lot sizes: the Tables of Assessment do not state fixed minimum lot sizes — minimum areas, frontages and special characteristics are set in the Reconfiguring a Lot Code (Tables 9.4.1.3.4 to 9.4.1.3.9, by lot type: Large, Established Suburban, New Suburban, Built to Boundary, Rural, Industrial) and the Building Height and Density Overlay (OV6) identifies optimal densities/lot sizes that are a requirement of subdivision. Precinct notes: several centre zones split answers by Core vs Frame precinct (e.g. Agricultural supplies store, Showroom, Outdoor sales, Parking station are ADSR in the Frame but code assessable in the Core). Height: where accommodation uses exceed OV6 Building Height and Density limits the level of assessment becomes impact assessable. Reconfiguring a lot is code assessable under Table 5.6.1 unless it meets Schedule 6 of the Planning Regulation 2017; subdividing one lot into two in residential/industry zones is code assessable under Schedule 10/12 of the Regulation. Under s5.3.2 any use not listed for a zone is impact assessable (MCU), building work is accepted unless a table or overlay says otherwise, and operational work is accepted unless a table says otherwise. Under s5.3.2(8) the highest category applies where a zone and overlay differ. A building development approval under the Building Act 1975 is still required for assessable building work even where the planning scheme treats it as accepted — this tool notes that separately. State Vegetation Management Act 1999 and koala habitat (Schedule 10 Regulation — prohibited in Koala Priority + Koala Habitat Areas) rules are separate from this local scheme position. Springfield Structure Plan may override these categories in that area.
What Ipswich City Council publishes
These come from the council's own website and planning scheme, read on 18 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.
- Listed character places
- Ipswich City Council's fact sheet says demolishing or removing a listed character place is usually not supported. (Applies to: Places listed in Schedule 7 (Local Character Places and Areas) of Ipswich City Plan 2025, shown on the Character Places and Areas Overlay.) Fact sheet: Character Places and Areas Overlay, V1.0 1.7.25 (Ipswich City Council)
- Development application fee, character building, code assessable (2026-27)
- The 2026-27 Ipswich City Council fee for a code assessable development application to demolish a character building in a Character Place or Area is $1,775. (Applies to: Character buildings in a Character Place or Area (Schedule 7), code assessable; excludes removal of post-1946 fabric.) Register of Fees and Charges 2026-2027, v2 as approved 24 September 2026 (Ipswich City Council)
- Development application fee, character building, impact assessable (2026-27)
- The 2026-27 Ipswich City Council fee for an impact assessable development application to demolish a character building in a Character Place or Area is $8,360. (Applies to: Character buildings in a Character Place or Area (Schedule 7), impact assessable; excludes removal of post-1946 fabric.) Register of Fees and Charges 2026-2027, v2 as approved 24 September 2026 (Ipswich City Council)
- Removal house: amenity decision and bond (2026-27)
- For a building relocated from inside the Ipswich City Council area, the 2026-27 fee for determining the performance security and the amenity and aesthetics decision is $995. The register says the security (bond) amounts are determined by the Responsible Officer. (Applies to: Reinstatement of a removal building on a new site in Ipswich.) Register of Fees and Charges 2026-2027, v2 as approved 24 September 2026 (Ipswich City Council)
- Building certification fee where Council is the certifier (2026-27)
- Where Ipswich City Council is engaged as the building certifier, the 2026-27 assessment fee for building work involving removal or demolition is $545. (Applies to: Removal or demolition of all classes of buildings, only where Council is engaged as the building certifier.) Register of Fees and Charges 2026-2027, v2 as approved 24 September 2026 (Ipswich City Council)
- Asbestos at resource recovery centres
- Ipswich City Council says asbestos is not accepted at the Riverview or Rosewood Resource Recovery Centres. (Applies to: Riverview and Rosewood Resource Recovery Centres.) Household Hazardous Waste (Ipswich City Council web page, fetched 2026-11-18)
The statewide rules
These apply across Queensland. Whether the council also needs to approve the demolition depends on your address: a heritage listing or a character overlay in the planning scheme is what brings it in.
- Building approval
- Demolishing a building is building work under the Building Act 1975, so it needs a building approval from a private certifier or the council. The regulation's list of work that needs no approval has no entry for demolishing a house.
- Time limits
- Once a demolition approval is given, the work must substantially start within 2 months and be finished within 1 year.
- Local heritage places
- Development on a place in a council's local heritage register is assessable across Queensland, so demolishing one needs a development application to the council.
- Character and pre-war housing areas
- There is no statewide rule. A council's planning scheme decides whether demolishing an older house in a character area needs a development application. Where a scheme does make demolishing a home assessable, a private certifier must hold the building approval documents for 5 business days before giving them to the applicant.
- State heritage places
- Any development on a place in the Queensland Heritage Register needs a development approval assessed by the State, unless an exemption certificate has been given. Exemption certificates are for work with little or no effect on the place.
- Asbestos: licensed removal
- A contractor needs an asbestos removal licence to remove more than 10 m² of bonded (non-friable) asbestos, and a class A licence for any friable asbestos. Asbestos must be removed before demolition starts, as far as is reasonably practicable.
- Asbestos: doing it yourself
- A homeowner can remove up to 10 m² of bonded asbestos. More than 10 m² needs a certificate from a Queensland Health-approved course. A homeowner can never remove friable asbestos.
- Notice to Workplace Health and Safety Queensland
- The contractor must give written notice at least 5 days before demolishing a structure that is at least 6 m high, or any demolition that uses load-shifting machinery on a suspended floor or explosives.
- Sewer and water
- Sealing the sewer drain of an existing building is notifiable plumbing work, done by a licensed plumber or drainer. Councils and water providers set their own disconnection steps and fees.
- A building approval for demolition and a development application are separate. A certifier can't replace the council's decision where the planning scheme or a heritage listing requires one.
- Building Act 1975, sections 5 (building work), 20 (assessable building work), 71 (time limits for demolition) and 88 (the 5 business day hold)
- Planning Regulation 2017, Schedule 10, sections 14 (local heritage places) and 15 (Queensland heritage places)
- Work Health and Safety Regulation 2011, sections 142 (notice of demolition work), 452, 458, 485 and 487 (asbestos)
- Public Health Regulation 2018, sections 7 and 8 — asbestos removal by homeowners
- Homeowner's certificate to remove asbestos — Queensland Government
- Plumbing and Drainage Regulation 2019, Schedule 1 — notifiable work
What else you'll need
- Building approval
More about Ipswich
- What can you build in Ipswich? Council overview and development applications
- Every Queensland zone explained, with what each council allows and the planning overlays that change the answer
- What Ipswich City Council charges for a development application, compared with other councils
- A Landbrief site report for your Ipswich address — every planning layer that applies to the lot
- Development applications in Redbank Plains
- Development applications in Bundamba
- Development applications in Walloon
- Development applications in Bellbird Park
- Development applications in Rosewood
- Development applications in Ripley
- Development applications in Swanbank
- Development applications in Brassall
Other projects in Ipswich
Granny flatDual occupancySubdivideShed or carportExtensionPoolFence or wallHome businessTownhousesShop, café or officeClear trees
The statewide position on this project: Demolish in Queensland.
Read from the Ipswich City Plan 2025 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.