Building Work assessable against the planning scheme - Partial Demolition and Extension to a Dwelling in the place of Local Significance Zone dual occ in character zone
Development applications in Redbank Plains
Every application Landbrief has seen on the Ipswich City Council public register for Redbank Plains — what's proposed, whereabouts, and the planning zone of each site. Updated daily. Seen one you want to object to? Here is how to object to a development application.
Check your own address in Redbank Plains
Free, and no sign-up: type a Redbank Plains address to see its planning zone and how many planning overlays apply. The full report ($49 incl. GST) names each one.
Did you mean ?
Checking the planning layers for this site — this takes 10–20 seconds…
Has Redbank Plains flooded? Recorded flood history for the suburb
About Redbank Plains
Census 2021, Australian Bureau of Statistics — the suburb, not this street. The 2026 Census was taken on 11 August 2026; the ABS publishes its first results in June 2027, and this section moves to them as soon as they are out.
Development application alerts, free
Get an email when something new is proposed in Redbank Plains
We watch the Ipswich City Council register daily. When an application is lodged or decided near you, you get a brief with the zone and planning constraints for the site.
What's being applied for
Recent applications (90 in the last 6 months)
Solara Estate - Stage 4 - Rate 3 Streetlighting and Electrical Reticulation Works
Century Estate - Stage 6 - Rate 3 Streetlighting and Electrical Reticulation Works
Century - Stage 8 - Road Work, Drainage Work, Stormwater, Earthworks & Signage
Century - Stage 7 - Road Work, Drainage Work, Stormwater, Earthworks & Signage
Edens Crossing - Stage 33A and 33B - Lots 1338-1381, 1383-1390 and 9002 on SP360338
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Reconfiguring a Lot - One (1) Lot into Eight (8) Lots plus Drainage Reserve Lot and New Road
Free alerts
Get new Redbank Plains applications by email
Only when something is lodged or decided. Unsubscribe any time.
Stormwater Drainage & Earthworks
Lots 1-3 on SP356960
Century Estate - Stage 5 - Rate 3 Streetlighting and Electrical Reticulation Works
Century Estate - Stage 3 - Rate 3 Streetlighting and Electrical Reticulation Works
Century Estate - Stage 4 - Rate 3 Streetlighting and Electrical Reticulation Works
Building Work assessable against the planning scheme - Roofed Deck affected by the Difficult Topograhy and Landslide Overlay
Reconfiguring a Lot - two (2) into seventy-two (72) lots plus park, drainage reserve and two (2) balance lots Material Change of Use - Dwelling Houses (72 Lots) Affected by Overlays Material Change of Use - Dual Occupan…
Show all 90 recent applications
Road Work, Stormwater, Earthworks
Stormwater & Earthworks
Material Change of Use - Health Care Service & Shop (Proposed Lot 1) and Shop (Proposed Lot 2) Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Rate 3 Streetlighting and Electrical Reticulation Works
Building Work assessable against the planning scheme - Secondary Dwelling affected by the Difficult Topography and Landslide Overlay
Century Estate Stage 2 - Lots 43-49, 67-75, 103-111, 216-220, 222, 224-230 & 269-271
Reconfiguring a Lot - Two (2) Lots into Thirty-Six (36) Lots plus Drainage Reserve, New Road and Access Easements
(Solara - Stage 4) Landscaping
Stormwater, Earthworks, Vehicle Crossovers
Stormwater, Earthworks and Driveway
Material Change of Use - Rooming Accommodation
Road work, Stormwater, Earthworks, ESC, Driveway
Minor Change - Advertising Devices
Operational Works - Advertising Devices (Six (6) Signs)
Reconfiguring a Lot - One (1) Lot into Five (5) Lots and Access Easement
Century Estate - Stage 4 - Landscaping
(Century Estate - Stage 3) - Landscaping
Century Estate - Stage 5 - Landscaping
(Solara Estate - Stage 4) - Road work, Drainage work, Stormwater, Earthworks & Signage
Material Change of Use - Rooming Accommodation (5 Rooms)
Roadworks
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Reconfiguring a Lot - one (1) lot into three (3) lots and access easements
Reconfiguring a Lot - One (1) Lot into Two (2) Lots and Access Easement
Lots 1-3 on SP360416
Building Work assessable against the planning scheme - Secondary Dwelling affected by the Flood Risk and Overland Flow Overlay and Waterway Corridors and Wetlands Overlay.
(Century Estate - Stage 6) Road Work, Stormwater Drainage Work and Earthworks
Operational Works - Advertising Devices (Ground Sign, Pylon Sign & Wall Sign)
Stormwater
The Plains - Stage 2 - Landscaping
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Operational Works - Advertising Device/s (One (1) Illuminated Wall Sign)
Landscaping
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Stormwater and Earthworks
Earthworks
Material Change of Use - Dual Occupancy
Material Change of Use - Dwelling House including Secondary Dwelling affected by the Difficult Topography and Landslide Overlay
Road Work, Drainage Work, Stormwater, Earthworks
Reconfiguring a Lot - One (1) lot into four (4) lots and access easements over two (2) stages
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
(Edens Crossing - Stage 34A) Road work, Drainage work, Stormwater, Earthworks
Building Work assessable against the planning scheme - Secondary Dwelling and Carport affected by the Mining Influence Area Overlay
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Reconfiguring a Lot - One (1) Lot into Five (5) Lots and Access Easement
Solara Estate Stage 3 - Rate 3 Streetlighting and Electrical Reticulation Works
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Landscaping
Reconfiguring a Lot - one (1) lot into four (4) lots plus access easement
Reconfiguring a Lot - One (1) Lot into Three (3) Lots
Road Work, Stormwater and Earthworks
Stormwater Drainage Work and Earthworks
Stormwater Drainage work and Earthworks
Material Change of Use - Dwelling House affected by the Overland Flow Path and Mining Influence Area Overlays
(Edens Crossing - Stage 35) Landscaping
Reconfiguring a Lot - One (1) Lot into Three (3) Lots
(Century - Stage 1 Stormwater Basin) Landscaping
(Century - Stage 2 Stormwater Basin) Landscaping
Road Work, Drainage Work, Stormwater, Earthworks
(Solara Estate - Stage 3) Landscaping
(Solara Estate - Stage 3) Landscaping
Reconfiguring a Lot - one (1) lot into two (2) lots
(Eden's Crossing - Stage 34B) - Road work, Drainage work, Stormwater & Earthworks
Reconfiguring a Lot - One (1) Lot into Two (2) Lots
Stormwater
Edens Crossing - Stage 35 - Road work, Drainage work, Stormwater and Earthworks
Road Work, Stormwater Drainage Work and Earthworks - Solara Stage 3
Reconfiguring a Lot - One (1) Lot into Thirty-Seven (37) Lots, One (1) Drainage Lot and Open Space
Reconfiguring a Lot - One (1) Lot into Three (3) Lots and Access Easement
Reconfiguring a Lot - One (1) Lot into Fifteen (15) Lots Plus Drainage Reserve
Material Change of Use - Major Utility (Telecommunications Tower) Reconfiguring a Lot - Subdivision by lease
Landscaping
Zones and overlays explained: what each Queensland zone allows · what planning overlays such as flood and bushfire change
Read next: plain-English guides
- Can I subdivide this block? Subdivision guide
- What is this property zoned? Zoning guide
- Is this address in a flood zone? Flood guide
- What is registered across the lot? Easements guide
- Is the site in a bushfire area? Bushfire guide
Nearby suburbs in Ipswich
Application details are reproduced from the Ipswich City Council public development register and may lag the council's own record; follow the council link for the authoritative file. Zones are resolved by Landbrief from published scheme mapping. Nothing here is planning advice.