Excavation and Fill Incl Retaining Walls - Bulk Earthworks & Vegetation Clearing - Town Centre Corridor
Development applications in Redland Bay
Every application Landbrief has seen on the Redland City Council public register for Redland Bay — what's proposed, whereabouts, and the planning zone of each site. Updated daily. Seen one you want to object to? Here is how to object to a development application.
Check your own address in Redland Bay
Free, and no sign-up: type a Redland Bay address to see its planning zone and how many planning overlays apply. The full report ($49 incl. GST) names each one.
Checking the planning layers for this site — this takes 10–20 seconds…
Has Redland Bay flooded? Recorded flood history for the suburb
About Redland Bay
Census 2021, Australian Bureau of Statistics — the suburb, not this street.
Development application alerts, free
Get an email when something new is proposed in Redland Bay
We watch the Redland City Council register daily. When an application is lodged or decided near you, you get a brief with the zone and planning constraints for the site.
What's being applied for
Zones these sites sit in
The zone sets what a site can be used for. Landbrief resolves it for each application from the Redland City Council scheme mapping — the register itself doesn't publish it.
Recent applications (23 in the last 6 months)
Operational Works for Stormwater Infrastructure (Bio-basin) Stages 4-7
Excavation and Fill Incl Retaining Walls
Material Change of Use for Dual Occupancy
Reconfiguring a Lot for Standard Format 1 into 2 lots and Access Easement
Combined Reconfiguring a Lot for Standard Format 1 into 2 lots and Design & Siting and Exempt MCU for Dwelling house
Driveway Crossover
Driveway Crossover
Free alerts
Get new Redland Bay applications by email
Only when something is lodged or decided. Unsubscribe any time.
Operational Works for RAL - Precinct 4 - DA9 Bulk Earthworks and Vegetation Clearing (Shoreline)
Driveway Crossover
Operational Works - Shoreline ? Intersection C ? Temporary Water Main Diversion
Operational Works for RAL - 1 into 10 lots (Shoreline DA7 Precinct 3 - Stage 5)
Operational Works for RAL - Trunk Collector Road (Potable Water Sewer Gravity Main Stormwater Landscaping Lighting)
Reconfiguring a Lot for Standard Format - 7 lots into 278 residential lots 1 sewer pump station lot 1 district sports park lot neighbourhood recreation park linear open space corridor including stormwater drainage …
Material Change of Use for Dual Occupancy
Show all 23 recent applications
Material Change of Use for Dual Occupancy
Driveway Crossover
Material Change of Use for Dual Occupancy
Reconfiguring a Lot One (1) lot into Two (2) lots (Standard Format)
Reconfiguring a Lot - Rearranging Boundaries 2 into 2 combined with Bulk CAR for 2x Dual Occupancies
Excavation and Fill Incl Retaining Walls - Bulk earthworks
Second Driveway Crossover
Material Change of use for Indoor Sport and Recreation (Yoga Studio) - Tenancy 5
Zones and overlays explained: what each Queensland zone allows · what planning overlays such as flood and bushfire change
Read next: plain-English guides
- Can I subdivide this block? Subdivision guide
- What is this property zoned? Zoning guide
- Is this address in a flood zone? Flood guide
- What is registered across the lot? Easements guide
- Is the site in a bushfire area? Bushfire guide
Nearby suburbs in Redland
Application details are reproduced from the Redland City Council public development register and may lag the council's own record; follow the council link for the authoritative file. Zones are resolved by Landbrief from published scheme mapping. Nothing here is planning advice.