CANCELLED - Material Change of Use for Dual Occupancy - DUPLICATE OF MCU26/0233
Development applications in Victoria Point
Every application Landbrief has seen on the Redland City Council public register for Victoria Point — what's proposed, whereabouts, and the planning zone of each site. Updated daily. Seen one you want to object to? Here is how to object to a development application.
Check your own address in Victoria Point
Free, and no sign-up: type a Victoria Point address to see its planning zone and how many planning overlays apply. The full report ($49 incl. GST) names each one.
Did you mean ?
Checking the planning layers for this site — this takes 10–20 seconds…
Has Victoria Point flooded? Recorded flood history for the suburb
About Victoria Point
Census 2021, Australian Bureau of Statistics — the suburb, not this street. The 2026 Census was taken on 11 August 2026; the ABS publishes its first results in June 2027, and this section moves to them as soon as they are out.
Development application alerts, free
Get an email when something new is proposed in Victoria Point
We watch the Redland City Council register daily. When an application is lodged or decided near you, you get a brief with the zone and planning constraints for the site.
What's being applied for
Zones these sites sit in
The zone sets what a site can be used for. Landbrief resolves it for each application from the Redland City Council scheme mapping — the register itself doesn't publish it.
Recent applications (19 in the last 6 months)
Operational Works for RAL - 19 lots 1 x Medium Density lot - Woodbury Precinct 3 (Stage 3)
Operational Works for RAL - 15 lots 3 x Medium Density lots - Woodbury Precinct 3 (Stage 4)
Material Change of Use for Dual Occupancy
Reconfiguring a Lot for 1 Lot into 3 Lots (Standard Format)
Material Change of Use for Multiple Dwelling (9 townhouses)
Building Work for Carport
Material Change of Use for Dual Occupancy (Lot 101)
Free alerts
Get new Victoria Point applications by email
Only when something is lodged or decided. Unsubscribe any time.
Preliminary Approval for Combined Material Change of Use and Reconfiguring a Lot including a Variation Request to Vary the Effect of the Planning Scheme for the purpose of Multiple Dwellings
Material Change of Use for Dual Occupancy
Combined Building Work and Design & Siting for storage shed
Excavation and Fill Incl Retaining Walls - Bulk Earthworks - Precinct 3 (Stage 3 - 6)
Operational Works for RAL - 1 into 27 Lots 1 x Medium Density Lot & Vegetation Clearing - Precinct 3 (Stage 1)
Operational Works for RAL - 1 Into 21 Lots - Woodbury Subdivision - Precinct 3 (Stage 2)
Material Change of Use for Dual Occupancy (refer also previous application BX338016 lodged 7/5/2026)
Show all 19 recent applications
Reconfiguring a Lot for Standard Format - 1 into 3 lots
Material Change of Use for Multiple Dwelling (5 Units)
Material Change of Use for Rooming Accommodation of 14 Units Combined with Reconfiguring a Lot for Standard Format 1 into 2 lots and Access Easement
Material Change of Use for Place of Worship
Zones and overlays explained: what each Queensland zone allows · what planning overlays such as flood and bushfire change
Read next: plain-English guides
- Can I subdivide this block? Subdivision guide
- What is this property zoned? Zoning guide
- Is this address in a flood zone? Flood guide
- What is registered across the lot? Easements guide
- Is the site in a bushfire area? Bushfire guide
Nearby suburbs in Redland
Application details are reproduced from the Redland City Council public development register and may lag the council's own record; follow the council link for the authoritative file. Zones are resolved by Landbrief from published scheme mapping. Nothing here is planning advice.