Fences and retaining walls in Central Highlands — do you need approval?

Central Highlands Regional Council's planning scheme — the Central Highlands Regional Council Planning Scheme 2016 (Amendment No. 7) — decides whether a fence or retaining wall needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a general residential zone

No planning approval needed. A domestic fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though a building approval may still apply to retaining walls.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Building work (a fence or retaining wall). Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
General residential zone No planning approval needed Table 5.6.1 A domestic fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though a building approval may still apply to retaining walls. Building approval for fences over 2 m or retaining walls over 1 m
High density residential zone No planning approval needed Table 5.6.1 A domestic fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though a building approval may still apply to retaining walls. Building approval for fences over 2 m or retaining walls over 1 m
Rural residential zone No planning approval needed Table 5.6.1 A domestic fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though a building approval may still be required for retaining walls. Building approval for fences over 2 m or retaining walls over 1 m
Emerging community zone No planning approval needed Table 5.6.1 A domestic fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though a building approval may still apply to retaining walls. Building approval for fences over 2 m or retaining walls over 1 m
Township zone No planning approval needed Table 5.6.1 minor building workIf not met: accepted if you meet the requirements. Building approval for fences over 2 m or retaining walls over 1 m
Centre zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though building approval may still be needed. Building approval for fences over 2 m or retaining walls over 1 m
Community facilities zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development unless an overlay applies, though a building approval may still be required. Building approval for fences over 2 m or retaining walls over 1 m
Environmental management and conservation zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development unless an overlay applies, though a building approval may still be required. Building approval for fences over 2 m or retaining walls over 1 m
Industry investigation zone No planning approval needed Table 5.6.1 minor building workIf not met: accepted if you meet the requirements. Building approval for fences over 2 m or retaining walls over 1 m
Industry zone No planning approval needed Table 5.6.1 minor building workIf not met: accepted if you meet the requirements. Building approval for fences over 2 m or retaining walls over 1 m
Low impact industry zone No planning approval needed Table 5.6.1 minor building workIf not met: accepted if you meet the requirements. Building approval for fences over 2 m or retaining walls over 1 m
Neighbourhood centre zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though building approval may still be needed. Building approval for fences over 2 m or retaining walls over 1 m
Principal centre zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though building approval may still be needed. Building approval for fences over 2 m or retaining walls over 1 m
Recreation and open space zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development unless an overlay applies, though a building approval may still be required. Building approval for fences over 2 m or retaining walls over 1 m
Rural zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development unless an overlay applies, though a building approval may still be required. Building approval for fences over 2 m or retaining walls over 1 m
Special industry zone No planning approval needed Table 5.6.1 minor building workIf not met: accepted if you meet the requirements. Building approval for fences over 2 m or retaining walls over 1 m
Specialised centre zone No planning approval needed Table 5.6.1 A fence or retaining wall is accepted development under the planning scheme unless an overlay applies, though building approval may still be needed. Building approval for fences over 2 m or retaining walls over 1 m

Overlays that change the answer

  • Flood hazard overlay. Within a flood risk category the category of development can change. A dwelling house (incl. secondary dwelling) material change of use / building work in the Balance Flood Risk Category is accepted only where the habitable floor is at least 300mm above natural ground level and no filling is involved; in the Low Risk Flood Category dwelling house / dwelling unit / dual occupancy / home based business is accepted only where habitable floor is at least Defined Flood Event + 300mm and no filling. Building work in Medium/High/Very High flood risk categories becomes code assessable. Reconfiguring a lot in any flood risk category is code assessable. Multiple dwelling (townhouses) in Medium/High/Very High flood risk categories becomes impact assessable. Otherwise code assessable unless accepted conditions met. (Table 5.8.1 Overlays — Flood hazard overlay)
  • Bushfire hazard overlay. Where within a medium, high, very high or potential impact buffer bushfire hazard area, building work involving a dwelling house, a listed material change of use (accommodation, business, industry, community, recreation activity groups) and reconfiguring a lot must be assessed against the Bushfire hazard overlay code (no change to category but overlay code applies as accepted requirements). (Table 5.8.1 Overlays — Bushfire hazard overlay)
  • Heritage overlay. Building work not associated with a material change of use that involves alteration, demolition, relocation or removal of a local heritage place becomes code assessable (against Heritage overlay code) where it would otherwise be accepted subject to requirements. A material change of use involving a local heritage place resulting in such building work also becomes code assessable. Applies to premises that are, or adjoin, a local heritage place. (Table 5.8.1 Overlays — Heritage overlay)

Worth knowing in Central Highlands

Minimum lot sizes, frontages and rectangular developable areas for each zone are set in Table 8.4.3.3.2 (Minimum lot size and dimensions), which was not reproduced in the supplied material, so numeric minimums could not be captured; the Reconfiguring a lot code (section 8.4.3) and Table 8.2.2 govern subdivision of one lot into two. Under the Regulation, subdivision of one lot into two lots is always code assessable (Schedule 10). The Rural zone contains Gemfields Core, Gemfields Frame and Gemfields Balance precincts which materially change the category of assessment for many uses (e.g. dwelling unit, shop, office, food and drink outlet, community uses) — owners in those precincts should check precinct-specific rows. Building work for a dwelling house and Class 10a outbuildings is generally accepted or accepted subject to requirements across all zones (and fully accepted for Class 10a in the Rural zone outside the Gemfields precincts); a building approval under the Building Act 1975 is still required separately. Development that is accepted does not need a development application. Home-based business is accepted subject to requirements in most zones provided it is not a high impact home-based business activity. Where a use is not listed for a zone the 'all other uses / undefined use' row applies, making it impact assessable. Overlay effects apply only to the part of the premises affected, and the highest applicable category prevails where zone and overlay differ. State Vegetation Management Act clearing controls operate separately from the scheme's operational work provisions.

What Central Highlands Regional Council publishes

These come from the council's own website and planning scheme, read on 17 November 2026. Each one links to the page it came from. Councils change their rules and fees, so open the source before you rely on a figure.

Fence under 2 m - council approval
Council says fences of less than two metres in height above natural ground do not require council approval in most cases. (Applies to: Central Highlands region.) Dividing fences (Central Highlands Regional Council web page)
Dividing fences - governing law
Council says dividing fences of individual allotments are controlled by the Neighbourhood Disputes (Dividing Fences and Trees) Act 2011. (Applies to: Central Highlands region.) Dividing fences (Central Highlands Regional Council web page)

The statewide rules

These are the statewide figures. A council's planning scheme can set its own, most often for front fences, and an overlay can add more, so check your council and your address before you rely on them.

Fence with no building approval
A fence no higher than 2 m above its natural ground surface. A pool fence is a separate case with its own safety standard.
Retaining wall with no building approval
A retaining wall where the wall and the fill or cut it holds total no more than 1 m, nothing loads the ground behind it (a building or a driveway, for example), and it is at least 1.5 m from a building or another retaining wall.
Side and rear boundaries
A fence or screen up to 2 m high can be built on a side or rear boundary with no setback.
Corner lots
Within the 6 m by 6 m triangle at the corner of two streets, fences, screens and retaining walls can be no more than 1 m high, so drivers can see around the corner.
Front fences
The statewide rules set no lower height for a front fence, but many councils do, and some ask for a fence you can partly see through. This is the figure most likely to differ where you live.
Dividing fences between neighbours
A sufficient dividing fence on residential land is between 0.5 m and 1.8 m high. Neighbours share its cost equally. A retaining wall is not a dividing fence under the Act.
Asking a neighbour to contribute
You give a notice to contribute with at least one written quote. If you can't agree within 1 month, either of you can apply to QCAT within 2 months of the notice. Until you agree, neither of you can do the work, unless it is urgent.
  • The 2 m and 1 m figures decide whether a building approval is needed. They don't override a council's planning scheme, a heritage or character overlay, or a covenant on a newer estate.
  • The boundary and corner figures come from the Queensland Development Code, parts MP 1.1 and MP 1.2. From 1 September 2026 the Queensland Housing Code replaces those parts in a council area whose planning scheme has been amended to adopt it.

What else you'll need

  • Building approval for fences over 2 m or retaining walls over 1 m

More about Central Highlands

Other projects in Central Highlands

Granny flatDual occupancySubdivideShed or carportExtensionPoolHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Fence or wall in Queensland.