landbrief.

Swimming pools in Banana — do you need approval?

Banana Shire Council's planning scheme — the Banana Shire Planning Scheme 2021 — decides whether a swimming pool needs a development application, and the answer depends on the zone your property is in. Below is what its table of assessment says for each zone; or check your own address.

In a general residential zone code

No planning approval needed. A private swimming pool is accepted building work, though a building approval and pool safety compliance are still required.

I don't know my zone — choose my council instead

The zone is on your rates notice, or a Landbrief site report will find it for you.

Zone by zone

Building work (a swimming pool). Residential zones first.

ZoneWhat the table saysConditionsWhat you'll need
General Residential Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work, though a building approval and pool safety compliance are still required. Building approval; Pool safety certificate
Rural Residential Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work, though a building approval and pool safety compliance are still required. Building approval; Pool safety certificate
Township Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work in the Township Zone (a building/pool safety permit is still needed), unless it affects a local heritage place. Building approval; Pool safety certificate
Centre Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work needing no planning approval (a building and pool-safety approval is still required). Building approval; Pool safety certificate
Community Facilities Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work needing no planning approval (a building and pool-safety approval is still required). Building approval; Pool safety certificate
Environmental Management and Conservation Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work needing no planning approval (a building and pool-safety approval is still required). Building approval; Pool safety certificate
Industry Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work needing no planning approval (a building and pool-safety approval is still required). Building approval; Pool safety certificate
Mixed Use Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work, though a building approval and pool safety compliance are still required. Building approval; Pool safety certificate
Recreation and Open Space Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work, though a building approval and pool safety compliance are still required. Building approval; Pool safety certificate
Rural Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work in the Rural Zone (a building/pool safety permit is still needed), unless it affects a local heritage place. Building approval; Pool safety certificate
Special Industry Zone Code No planning approval needed Table 4.5.1 A private swimming pool is accepted building work in the Special Industry Zone (a building/pool safety permit is still needed), unless it affects a local heritage place. Building approval; Pool safety certificate

Overlays that change the answer

  • Local heritage place. Building work for alteration, extension, partial demolition or a new building on a local heritage place is code assessable (Local Heritage Place Code – Table 6.3.10). Minor building work on a heritage place is accepted subject to requirements, or code assessable where not accepted. Building work (other than minor) adjoining a heritage place is code assessable. Any permanent alteration to the appearance of a heritage place is code assessable, and operational work (including clearing) and reconfiguring a lot on a heritage place site is code assessable. (Tables 4.1.1, 4.1.3, 4.1.4, 4.3.1, 4.5.1)

Worth knowing in Banana

Minimum lot sizes are not listed in the Tables of Assessment — they are in Table 6.3.6 of the Reconfiguring a Lot Code, which was not provided. For every zone, subdividing is code assessable where resulting lots meet the minimum lot areas of Table 6.3.6, and impact assessable where any lot does not comply (Table 4.3.1). Amalgamation of lots and creation of an access easement to one lot are accepted/ADSR in all zones. MUIRS ROAD PRECINCT (Rural Zone): the accepted and accepted-subject-to-requirements MCU pathways in Table 4.1.1, the accepted/ADSR earthworks and minor-electricity operational-work pathways, and some other concessions do NOT apply in this precinct; building work in the Muirs Road Precinct not associated with a material change of use is code assessable against the Rural Zone Code. COMMUNITY FACILITIES ZONE Precinct 6: operational work for a municipal waste facility is accepted. Zone-specific material change of use categories (granny_flat, dual_occupancy, home_business, townhouses, shop_office, etc.) are set by the individual zone codes in Part 5, which were not supplied here — rules for those uses will rely on each zone code's table of assessment and default/'any other use' rows. A building approval under the Building Act may still be required even where planning assessment is 'accepted'.

What else you'll need

  • Building approval
  • Pool safety certificate

More about Banana

Other projects in Banana

Granny flatDual occupancySubdivideShed or carportExtensionFence or wallHome businessTownhousesShop, café or officeClear treesDemolish

The statewide position on this project: Pool in Queensland.

Read from the Banana Shire Planning Scheme 2021 tables of assessment. General information, not advice. The council's planning scheme and the Planning Act 2016 decide — confirm with the council or a town planner before you build.