Minor Change to Approval
Development applications in Beaudesert
Every application Landbrief has seen on the Scenic Rim Regional Council public register for Beaudesert — what's proposed, whereabouts, and the planning zone of each site. Updated daily. Seen one you want to object to? Here is how to object to a development application.
Check your own address in Beaudesert
Free, and no sign-up: type a Beaudesert address to see its planning zone and how many planning overlays apply. The full report ($49 incl. GST) names each one.
Did you mean ?
Checking the planning layers for this site — this takes 10–20 seconds…
Has Beaudesert flooded? Recorded flood history for the suburb
About Beaudesert
Census 2021, Australian Bureau of Statistics — the suburb, not this street. The 2026 Census was taken on 11 August 2026; the ABS publishes its first results in June 2027, and this section moves to them as soon as they are out.
Development application alerts, free
Get an email when something new is proposed in Beaudesert
We watch the Scenic Rim Regional Council register daily. When an application is lodged or decided near you, you get a brief with the zone and planning constraints for the site.
What's being applied for
Recent applications (58 in the last 6 months)
Minor Change to Approval (MCBd16/069)
Roadworks Stage 7
Preliminary Approval
Earthworks
Minor Change to Approval MCU25/039 - Dual Occupancy
Electrical Reticulation
Low impact industry, Warehouse
Free alerts
Get new Beaudesert applications by email
Only when something is lodged or decided. Unsubscribe any time.
Roadworks, earthworks, stormwater & clearing of vegetation
Warehouse
Dual occupancy
Standard Format Plan - Spring Creek Stage 7a & 7b
TESTING EPROPERTY - DO NOT PROCESS - DELETE AFTER TESTING
Earthworks
Earthworks
Show all 58 recent applications
Landscaping Associated to Reconfiguration
Dual occupancy
Earthworks, Stage 11 civil works of the proposed development
Standard Format Plan - Beaumoor Stage 5
Boundary Realignment
Multiple Dwelling unit (3 additional flats)
Standard Format Plan - Beaumoor Stage 1
Minor Change to Approval
Minor Change to Approval
Extension of Time for Currency Period
Extension of Time for Currency Period
Minor Change to Approval. Refer to MCU25/161
Minor Change to Approval
Minor Change to Approval
Minor Change to Approval
Extension of Time for Currency Period
Extension of Time for Currency Period
Roadworks
Electrical Reticulation
Multiple dwelling
Subdivision
Storm Water - Drainage Work
Minor Change to Approval
Electrical Reticulation
Multiple dwelling
Minor Change to Approval
Storm Water & Earthworks
Reconfiguring a Lot - Stages 14-15 Spring Creek Estate - 67 Lots, 3 Balance Lots, 1 Open Space/drainage reserve and new road
Extension of Time for Currency Period
Showroom
Signage
Multiple Dwelling (4 Dwellings)
Landscaping Associated to Reconfiguration
Offices
Warehouse
Multiple dwelling
Dwelling unit 5 Multiple Dwellings
Low impact industry
Other Change to Approval MCU21/087
Subdivision - 2 Lots into 100 Lots, 2 Stormwater Lots, New Road and a Balance Lot
Preliminary Approval (Variation)
Applicant instigated Exemption Certificate
Multiple dwelling
Zones and overlays explained: what each Queensland zone allows · what planning overlays such as flood and bushfire change
Read next: plain-English guides
- Can I subdivide this block? Subdivision guide
- What is this property zoned? Zoning guide
- Is this address in a flood zone? Flood guide
- What is registered across the lot? Easements guide
- Is the site in a bushfire area? Bushfire guide
Nearby suburbs in Scenic Rim
Application details are reproduced from the Scenic Rim Regional Council public development register and may lag the council's own record; follow the council link for the authoritative file. Zones are resolved by Landbrief from published scheme mapping. Nothing here is planning advice.